CityTN
Posted
Oct 7, 2026
Oct 22, 2026
2026 CDBG Sanitary Sewer System Inspection for the Town of Somerville
Provide sanitary sewer system inspection. Contractor shall clean all manholes and sewer line segments within the project area and then physically inspect all sewer line segments and manholes within the project area. The length of the sewer line to be cleaned, inspected and smoke tested is approx. 2,300 LF of 6-inch sewer line, 2,200 LF of 8-inch sewer line, and 500 LF of 10-inch sewer line. There are approx. 26 manholes that shall be cleaned and inspected.
