Aug 21, 2026
Closes
Sep 16, 2026
Washington Avenue Lighting RFP
Work includes install complete lighting system; lights to be wired in parallel 240v ac 60 hz; lights shall be controlled by dusk-to-dawn photocell sensors at each light fixture; the above-grade electrical conduit shall be schedule 80 grey conduit;the below-grade electrical conduit shall be schedule 40 grey conduit; the contractor shall coordinate meter height and weatherhead requirements with city water and light. The contractor shall coordinate service point location and material with city water and light.