CityND
Aug 7, 2026
Closes
Aug 28, 2026
2026 Structure Demolition and Site Restoration
Demolish structures at approx 14 properties. Basement excavation and site restoration will also be completed.
Description: Work includes approx. 342 LF of removal and disposal of existing 36" perforated RCP discharge line; 25 EA of tree protection; 2,200 SY of restoration of riverbed.
City · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Ventura.
These related opportunities are still open for bidding.
CityND
Aug 7, 2026
Closes
Aug 28, 2026
Demolish structures at approx 14 properties. Basement excavation and site restoration will also be completed.
CityAR
Aug 10, 2026
Closes
Sep 14, 2026
Project includes the following Work: Extend the City of Ola’s raw water intake further into the lake to draw from greater depths, thereby significantly improving raw water quality. The work includes installing submerged 12-inch HDPE DR17 piping from the existing intake tower to a deeper lake-bed terminus. This new underwater intake terminus features dual passive cylindrical wedge-wire T-screens anchored to a heavy 6'x6' reinforced concrete foundation. To secure the underwater work zone and alert public marine traffic, five (5) high-visibility regulatory warning buoys will be permanently anchored on the lake surface at a 300-foot radius around the submerged pipeline.
CityAR
Aug 3, 2026
Closes
Aug 26, 2026
Construction of an intake structure project for the City of Ola, including the installation of submerged 12-inch HDPE DR17 piping, dual passive cylindrical wedge-wire T-screens, and regulatory warning buoys.
Wisconsin Department of Transportation
State AgencyWI
Aug 11, 2026
Closes
Sep 15, 2026
Work includes : 147 CY excavation common; 241 CY concrete masonry bridges; 97 SY pigmented surface sealer; 18 SY rubberized membrane waterproofing; 210 LF pipe underdrain wrapped 6"; 6 EA removing small sign supports; see attached file.