Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Ola
Work consists of approx, 1,100 CY compacted borrow, complete in place; 525 SY r&d of existing asphalt paving; 200 TON base course; 45 LF quadruple 12'x6' reinforced concrete box culvert, w/wingwalls, complete in place.
Posted Date
May 5, 2025
Due Date
Aug 18, 2025
Release: May 5, 2025
City of Ola
Close: Aug 18, 2025
Work consists of approx, 1,100 CY compacted borrow, complete in place; 525 SY r&d of existing asphalt paving; 200 TON base course; 45 LF quadruple 12'x6' reinforced concrete box culvert, w/wingwalls, complete in place.
City of Ola
Furnish and install a new booster pump building and station with VFD controls and remove the old station once completed. 30 LF of 4" DIP Water Main, all fittings and blocking as required. Complete in Place; 2 EA of 6"x4" Tapping Sleeve and Valve, includes valve box and lid, with concrete ring, Complete in Place; 2 EA of Cut, Plug and Cap Existing 3" Water Line, Complete in Place; Concrete Block Building, w/ Shingle Roof, includes concrete pad, doors, vent, gutters and etc., Complete in Place; Electrical for pump building, including new service drop and connection, Complete in Place; Duplex Pump Station, 5HP, 3 Phase, w/ VFDs and controls, includes all wiring and electrical as related to the pump station, Complete In Place; Remove and Dispose of Existing Pump Station, including disconnection of electrical service.
Posted Date
Mar 30, 2026
Due Date
Apr 20, 2026
Release: Mar 30, 2026
City of Ola
Close: Apr 20, 2026
Furnish and install a new booster pump building and station with VFD controls and remove the old station once completed. 30 LF of 4" DIP Water Main, all fittings and blocking as required. Complete in Place; 2 EA of 6"x4" Tapping Sleeve and Valve, includes valve box and lid, with concrete ring, Complete in Place; 2 EA of Cut, Plug and Cap Existing 3" Water Line, Complete in Place; Concrete Block Building, w/ Shingle Roof, includes concrete pad, doors, vent, gutters and etc., Complete in Place; Electrical for pump building, including new service drop and connection, Complete in Place; Duplex Pump Station, 5HP, 3 Phase, w/ VFDs and controls, includes all wiring and electrical as related to the pump station, Complete In Place; Remove and Dispose of Existing Pump Station, including disconnection of electrical service.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track City of Ola's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database