Posted
Sep 29, 2026
Oct 21, 2026
2024 Community Development CLUTE SANITARY SEWER IMPROVEMENTS - BRYAN SUBDIVISION RFP
This RFP is for the installation of wastewater collection network improvements within the Bryan Subdivision in Clute, Texas.
Description: Installation of wastewater collection network improvements within the Bryan Subdivision in Clute, Texas, including: Approx. 4,000 LF of 8” SDR-26 PVC sanitary sewer pipe by dry bore & open cut, with appurtenances. Approx. 2,000 LF of 10” SDR-26 PVC sanitary sewer pipe by dry bore & open cut, with appurtenances. Twenty-one (21) 4’ diameter and one (1) 6’ diameter sanitary sewer manholes including pipe connections. Forty-five (45) 6” long-side residential service connections by open cut or dry bore under roadway pavement with cleanouts. Fifty-two (52) 6” short-side residential service connections with cleanouts.
City · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Posted
Sep 29, 2026
Oct 21, 2026
This RFP is for the installation of wastewater collection network improvements within the Bryan Subdivision in Clute, Texas.
CityCT
Posted
Sep 25, 2026
Oct 23, 2026
Construction of sanitary improvements within the town easement includes 160 HR of uniformed trafficmen; clearing and grubbing; 20 CY of trench excavation and backfill, rock, 0'-8' deep; 20 CY of trench excavation and backfill, rock, 0'-8' deep; 1,140 CY of trench excavation and backfill, earth, 0'16' deep; 2,000 SF of temporary earth retaining system; protection pf building and property and condition survey (site no 1); 3,000 SY of furnishing and placing topsoil and seed. See outside link.
CityOH
Posted
Sep 23, 2026
Oct 23, 2026
Project includes the following work: infrastructure improvements throughout the city including approx. 6.8 miles of water main including valves, fittings, fire hydrants, services, and 244 feet of horizontal directional drilling/bore; approx. 1.8 miles of storm sewer including manholes, curb inlets, and 274 feet of horizontal directional drilling/bore; and approx. 2.3 miles of sanitary sewer pipe including manholes, services, and approx. 107 feet of jack and bore; and approx. 5.8 miles of roadway resurfacing and 1.3 miles of roadway reconstruction including curb ramps, sidewalks, curb, drive aprons, and pavement markings. See outside link.
CityOH
Posted
Sep 23, 2026
Oct 23, 2026
Project includes the following work: infrastructure improvements throughout the city including approx. 6.8 miles of water main including valves, fittings, fire hydrants, services, and 244 feet of horizontal directional drilling/bore; approx. 1.8 miles of storm sewer including manholes, curb inlets, and 274 feet of horizontal directional drilling/bore; and approx. 2.3 miles of sanitary sewer pipe including manholes, services, and approx. 107 feet of jack and bore; and approx. 5.8 miles of roadway resurfacing and 1.3 miles of roadway reconstruction including curb ramps, sidewalks, curb, drive aprons, and pavement markings. See outside link.
Decision makers connected to this RFP from City of Clute.