CityOH
Posted
Sep 23, 2026
Oct 23, 2026
Water and Sanitary Sewer Infrastructure Improvements
Project includes the following work: infrastructure improvements throughout the city including approx. 6.8 miles of water main including valves, fittings, fire hydrants, services, and 244 feet of horizontal directional drilling/bore; approx. 1.8 miles of storm sewer including manholes, curb inlets, and 274 feet of horizontal directional drilling/bore; and approx. 2.3 miles of sanitary sewer pipe including manholes, services, and approx. 107 feet of jack and bore; and approx. 5.8 miles of roadway resurfacing and 1.3 miles of roadway reconstruction including curb ramps, sidewalks, curb, drive aprons, and pavement markings. See outside link.
