Port Clinton Sidewalk Project
Aug 4, 2026
Closes
Aug 26, 2026
Work includes 1 LS of clearing and grubbing; 1 EA of tree removed, 4"x12" Dia; 1 EA of tree removed, 30" Dia; 804 SY of pavement removed; 1150 SF of walk removed; 401 ft of curb removed; 146 ft of curb and gutter removed; 26 SF of removal misc brick pavers; 328 CY of excavation; 10 CY of embankment; 2346 SY of subgrade compaction; 12123 SF of 4"concrete walk; 1753 SF of curb ramp; 220 SF of detectable warning; 90 CY of topsoil furnished and placed; 4720 SY of seeding and mulching; 0.4 ton of commercial fertilizer; 25 mgal of water; 2000 EA of erosion control; 10 EA of manhole adjusted to grade; 250 CY of aggregate base; 804 SY of 6" non-reinforced concrete pavement, class GC MS. See outside link