Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
West Virginia Department of Transportation
Structure replacement. Concrete slab on fabricated steel girder span(s): structure steel.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Panola County
Seal rock - sizes #7, #8, #57 & #89.
Posted Date
Nov 12, 2025
Due Date
Dec 1, 2025
Release: Nov 12, 2025
Panola County
Close: Dec 1, 2025
Seal rock - sizes #7, #8, #57 & #89.
AvailableVirginia Department of Transportation
This project will replace the existing bridge on Route 17 northbound over Dragon Run. During construction, the bridge over Dragon Run on Route 17 northbound would be closed. Northbound traffic would be diverted to cross the Route 17 southbound bridge over Dragon Run, with a single northbound and southbound travel lane sharing the southbound bridge. VDOT is replacing the existing bridge to improve the condition of the northbound Dragon Run crossing. The new bridge will be raised to an elevation similar to the Route 17 southbound bridge over Dragon Run.
Posted Date
-
Due Date
Dec 12, 2025
Virginia Department of Transportation
Close: Dec 12, 2025
This project will replace the existing bridge on Route 17 northbound over Dragon Run. During construction, the bridge over Dragon Run on Route 17 northbound would be closed. Northbound traffic would be diverted to cross the Route 17 southbound bridge over Dragon Run, with a single northbound and southbound travel lane sharing the southbound bridge. VDOT is replacing the existing bridge to improve the condition of the northbound Dragon Run crossing. The new bridge will be raised to an elevation similar to the Route 17 southbound bridge over Dragon Run.
AvailableBolivar County
Bolivar County, Mississippi is seeking bids for a one‑year supply of road construction materials including emulsified asphalt, gravel, sand, wash rock, cold asphalt, and limestone #7, #57, and #610 for 2026. Bids must be submitted by 4:00 pm on November 21, 2025, with a reverse auction scheduled for November 24, 2025.
Posted Date
Nov 5, 2025
Due Date
Nov 21, 2025
Release: Nov 5, 2025
Bolivar County
Close: Nov 21, 2025
Bolivar County, Mississippi is seeking bids for a one‑year supply of road construction materials including emulsified asphalt, gravel, sand, wash rock, cold asphalt, and limestone #7, #57, and #610 for 2026. Bids must be submitted by 4:00 pm on November 21, 2025, with a reverse auction scheduled for November 24, 2025.
AvailableIowa Department of Transportation
2,805 CY embankment-in-place; 460 CY excavation, cl 10; 507 CY modified subbase; 860 LF silt fence; 2 Ea steel beam guardrail barrier trans section; 690 CY topsoil, strip/salvage/spread. See attached file.
Posted Date
Oct 21, 2025
Due Date
Nov 18, 2025
Release: Oct 21, 2025
Iowa Department of Transportation
Close: Nov 18, 2025
2,805 CY embankment-in-place; 460 CY excavation, cl 10; 507 CY modified subbase; 860 LF silt fence; 2 Ea steel beam guardrail barrier trans section; 690 CY topsoil, strip/salvage/spread. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis