Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge replacement with approach roadway and related work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
Posted Date
Oct 6, 2025
Due Date
Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 27, 2026
Work includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
AvailableWork includes approx. 1 LS clearing and grubbing, 73,418 CY unclassified excavation, 3,400 SY solid sodding, 1,378 SY ditch liner, 68 Thousand Gallon watering, 10 AC insect pest control, 114 AC mowing, 19 AC grassing, 700 TN riprap for erosion control, 1,887 SY fine milling, 3,745 Gal asphalt for tack coat, 4 Mile rumble strips, 1,018 LF saw cut, 208 LF 24" reinforced concrete pipe, 775 LF guardrail, signage, pavement marking, 300 LF precast concrete median barrier.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
Work includes approx. 1 LS clearing and grubbing, 73,418 CY unclassified excavation, 3,400 SY solid sodding, 1,378 SY ditch liner, 68 Thousand Gallon watering, 10 AC insect pest control, 114 AC mowing, 19 AC grassing, 700 TN riprap for erosion control, 1,887 SY fine milling, 3,745 Gal asphalt for tack coat, 4 Mile rumble strips, 1,018 LF saw cut, 208 LF 24" reinforced concrete pipe, 775 LF guardrail, signage, pavement marking, 300 LF precast concrete median barrier.
AvailableWork consists of road and bridge construction, in general, the removal and replacement of an existing single plan railroad car girder bridge with timber deck and asphalt concrete overlay with a new single span precast voided slab girder bridge with cast-in-place reinforced concrete deck.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Work consists of road and bridge construction, in general, the removal and replacement of an existing single plan railroad car girder bridge with timber deck and asphalt concrete overlay with a new single span precast voided slab girder bridge with cast-in-place reinforced concrete deck.
AvailableReplacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →