CityFL
Posted
Sep 4, 2026
Oct 13, 2026
Roadway and Drainage Improvements to SE 5 St, SE 6 St, and SE 7 St from SE 4 Ave to SE 6 Ave
Work includes 12,240 ED work zone sign; 22,440 ED channelizing device - types i, ii, di, vp, drum, or lcd; 864,000 ed channelizing device - pedestrian lcd (longitudinal channelizing device); 6,840 ED type iii barricade; 5,390 SY removal of existing concrete; 5,213. 8 CY regular excavation; 329 LF milling existing asphalt pavement, 1" avg depth; 6,50. 1 TN asphalt concrete friction course, traffic c, fc-9. 5, pg 76-22; 22 EA inlets, curb, type 9, <10'; 31 EA inlets, dt bot, type c, <10' (miami dade county standard detail d-3); 14 EA manholes, p-7, <10'; 513 LF pipe culvert, optional material, round, 18" s/cd. See outside link.
