Bissell Point WWTF Trickling Filter Pump Replace-Final Clarifier Tank & Concrete Rehab RFP

Description: Project consists : 1. Replacement of trickling filter pumps, motors, and drives and associated piping, valves, and seal water system. New trickling filter pumps include five, 33-mgd constant speed pumps and three, 95-mgd variable speed pumps. 2. Upgrades to the Trickling Filter Pump Station medium voltage motor control lineups and associated conductor replacement. 3. Replacement of Trickling Filter Flow Control Valves. 4. Rehabilitation of twelve, 150-foot diameter final clarifies, including the following: mechanism and bridge replacement, structural repairs, drain valve replacement, weir and baffle replacement, weir brushes, and associated electrical and controls work. 5. Structural repairs of the Influent Pump Station, Grit Tanks, Pre-Aeration Basins, Primary Sedimentation Tanks, tunnels, and associated channels. 6. Addition of a guard booth and modification of the entrance and exit gates. 7. General construction of wastewater treatment buildings and structures including sitework, yard piping, structural, architectural, process piping and equipment, plumbing, heating, ventilation, air conditioning, electrical, and instrumentation and control.

Buyer
Metro St Louis Sewer District

SpecialDistrict · MO, US

Released
-
Closes
Oct 21, 2026(6 days left)

RFP documents

Solicitation files and supporting documents for this bid.

RFP documents aren’t available here yet.

Our team can help you find the original solicitation documents.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts