CityTX
Posted
Sep 21, 2026
Oct 15, 2026
Wastewater Treatment Plant No. 1A – Clarifier No. 1 Rehabilitation
Work includes wastewater treatment plant no. 1a - clarifier no. 1 rehabilitation.
Description: A new, town-furnished drive for final clarifier (FC) #1 at the wastewater treatment plant. The drive unit for FC #1 has already been purchased by the town. This installation project was previously delayed due to critical plant valve issues which have now been resolved, permitting the safe drain.
City · MA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityTX
Posted
Sep 21, 2026
Oct 15, 2026
Work includes wastewater treatment plant no. 1a - clarifier no. 1 rehabilitation.
CityTX
Posted
Oct 7, 2026
Oct 22, 2026
Provide wastewater treatment plant centrifuge no. 2 installation.
CityMS
Posted
-
Nov 3, 2026
The work shall consist of: Replacing and repairing equipment at the City Wastewater Treatment Plant.
CityKS
Posted
Sep 22, 2026
Oct 14, 2026
The City of Colwich is seeking bids for installation of aeration equipment for its wastewater treatment plant lagoon system. Triplepoint will install the aerators and associated air piping, while the general contractor must provide the electrical work, install and set the blower pad, and coordinate with the equipment supplier. Bids are to be received at the City of Colwich office at 212 W. Wichita Ave., Colwich, KS 67030, by October 14, 2026 at 9:00 a.m. local time, when they will be publicly opened and read.
Decision makers connected to this RFP from City of Amherst.