Collective Storm Drainage Improvement Project - Series AJ RFP
Work include approx 60 LF of 24" rcp; 28 LF of 24" CIPP; 120 LF of 18" RCP; 143 LF of 24" RCP; 343 SY 0.0"-3.0" milling ashpalt pavement.
Description: Provide regrading and re-shaping various ditches on SRT, drainage system upgrades, erosion control measures, and associated drainage infrastructure improvements.
SpecialDistrict · TX, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
436 days before RFP
The NTTA Board approved advertising construction services for Sam Rayburn Tollway drainage rehabilitation.
Elizabeth Mow presented staff's recommendation on the request to advertise for construction services for Sam Rayburn Tollway drainage rehabilitation. Director Gravley made a motion to approve item 7C, Director Knight seconded the motion, and it was approved unanimously (Res. No. 25-88).
North Texas Tollway Authority Minutes of the Board of Directors Meeting
Board meeting · Aug 20, 2025
7. Request to advertise for the following: A. Construction services for Dallas North Tollway and Lewisville Lake Toll Bridge pavement restriping B. Construction services for Sam Rayburn Tollway drainage rehabilitation
North Texas Tollway Authority Regular Meeting
Meeting agenda · Oct 28, 2026
Capital improvement plan
422 days before RFP
The FY2026-FY2030 Capital Plan lists a planned Erosion Mitigation & Drainage Repairs project with a FY2026 forecast of $9.14 million.
Project Number: 1000013 Budget Year: 2026 Project Title: Erosion Mitigation & Drainage Repairs Manager: Project Delivery Fund: 1201 Project Partner: N/A Roll-up Department Level 2: NTTA-20510-Total Project Delivery Total Project Cost: Project Type: Facilities/Roadway Prior Year Cost: Descripton: Major channel, ditch or embankment erosion projects. To…
North Texas Tollway Authority Five-Year Capital Plan 2026-2030
Capital improvement plan · Sep 3, 2025
RFP published
Proposals due (14 days left)
Adjacent opportunities open for bidding right now.
CityNC
Posted
Oct 28, 2026
Dec 3, 2026
Work include approx 60 LF of 24" rcp; 28 LF of 24" CIPP; 120 LF of 18" RCP; 143 LF of 24" RCP; 343 SY 0.0"-3.0" milling ashpalt pavement.
CityNC
Posted
Oct 15, 2026
Nov 19, 2026
Work includes rehabilitation of an existing 60 LF 8' x 6' RCBC, including addressing exposed rebar, concrete elamination, and vegetation removal, remove and replace approx 234 LF of 15" RCP, water and sewer relocations, remove and replace approx 102 LF of 18" RCP, sewer relocation, install storm drainage infrastructure, install approx 358 LF of 18" RCP, 36 LF of 24" RCP, and 10 structures, approx 500 LF of curb and gutter will be installed, two sewer relocations will be required.
CountyIA
Posted
Oct 27, 2026
Nov 17, 2026
Project consists of 20 linear feet of 48” diameter corrugated metal pipe, 40 linear feet of 42” reinforced concrete pipe, modification of an existing manhole, placing trench foundation stone, and any and all other miscellaneous items related thereto. The Board of Supervisors, acting as Trustees, will select any combination of Divisions and Alternates, which is in the best interest of the Drainage District, based on bid factors such as price, and pipe material. All Bidders will be required to complete each division and alternate of the “Proposal, Attachment C, Bid Items and Quantities” (including all alternate options) to be considered for the award.
School DistrictKS
Posted
Oct 30, 2026
Nov 18, 2026
Provide parking addition & site drainage improvement.
Decision makers connected to this RFP from North Texas Tollway Authority.