CityCT
Posted
Oct 14, 2026
Nov 4, 2026
Phase 6 Sewer System Rehabilitation RFP
Work includes approx 7,360 LF of 8" CIPP lining sewer pipe; 128 EA sewer main lateral reinstatement; 70,890 LF of 8" CCTV inspection.
Description: The San Antonio River Authority seeks a consultant to conduct a partial Sewer System Evaluation Study of its sanitary sewer collection system in Testing Areas 1–4. The work includes field investigations, data analysis, and reporting to identify infiltration and inflow sources, assess defects, and evaluate system performance. Findings will guide rehabilitation and maintenance priorities, reduce excessive wet-weather flows, and support long-term reliability; each testing area is expected to take approximately 4–5 months.
SpecialDistrict · TX, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityCT
Posted
Oct 14, 2026
Nov 4, 2026
Work includes approx 7,360 LF of 8" CIPP lining sewer pipe; 128 EA sewer main lateral reinstatement; 70,890 LF of 8" CCTV inspection.
CityDE
Posted
Sep 26, 2026
Nov 4, 2026
Work consists of the following: furnishing and installing approx. 252 linear feet of 24-inch PVC gravity sewer main and 62 LF of 10-inch PVC gravity sewer main via open cut as well as 160 linear feet of 24-inch PVC gravity sewer main via jack and bore, including seven (7) sewer manholes, 7 manhole frame and covers, and pavement and gravel trench restoration. There will be an alternate bid with items listed on the bid form.
CityIL
Posted
Oct 6, 2026
Nov 3, 2026
Approx., 3,800 LF of open cut sanitary sewer replacement (6" and 8" PVC) and twenty (20) sanitary manholes, coring six (5) existing sanitary structures, one (1) point repair, along with 600 LF of open cut storm pipe replacement (12" class B) and replacement of twelve (11) storm structures. The improvements will require reconnection of ninety-six (96) service connections with the potential for dye testing of up to ninety-three (93) existing parcels, installation of seven (7) sanitary cleanouts as well as restoration and other related and incidental work.
CityIN
Posted
Sep 25, 2026
Oct 27, 2026
Work includes removal of a portion of an existing 78-IN storm line, installation of baffle rings in another portion of the existing 78-IN storm pipe, installation of an energy dissipation chamber and new 78-storm pipe.
Decision makers connected to this RFP from San Antonio River Authority.