Camden County Municipal Utilities Authority
Special DistrictNJ
Posted
Sep 27, 2026
Nov 5, 2026
Leone Park Sanitary Sewer Rehabilitation - Phase 2
Project consists of Sanitary sewer rehabilitation.
Description: Approx., 3,800 LF of open cut sanitary sewer replacement (6" and 8" PVC) and twenty (20) sanitary manholes, coring six (5) existing sanitary structures, one (1) point repair, along with 600 LF of open cut storm pipe replacement (12" class B) and replacement of twelve (11) storm structures. The improvements will require reconnection of ninety-six (96) service connections with the potential for dye testing of up to ninety-three (93) existing parcels, installation of seven (7) sanitary cleanouts as well as restoration and other related and incidental work.
City · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Danville.
Adjacent opportunities open for bidding right now.
Camden County Municipal Utilities Authority
Special DistrictNJ
Posted
Sep 27, 2026
Nov 5, 2026
Project consists of Sanitary sewer rehabilitation.
CityOH
Posted
-
Nov 3, 2026
Work includes rehabilitation of approx. 5,225 LF of 8" through 10" sanitary sewer with a fold-and-form pipe lining system, minor to heavy cleaning and televising of 5,225 LF of sewer prior to lining to locate taps and remove roots, re-establishing 60 active laterals, televising 5,225 LF of lined sewer for verification, testing and grouting the laterals at the point of connection, lining 104 VF of concrete and brick/block sanitary manholes, lining 42.27 VF of steel manholes, restoration, and related items.
CityMT
Posted
Oct 4, 2026
Oct 21, 2026
The project consists of the cleaning, installation of approx. 13,575 LF of 8, 9, 12, 15, and 42" cured-in-place-pipe (CIPP); internally reinstating approx. 430 service connections; and recording the final check of lines.
CityIA
Posted
Sep 28, 2026
Oct 14, 2026
Mainline cleaning, 8" 171 lf, additional sewer cleaning, 4”-12”, manhole leak repair, pressure chemical injection, major infiltration, removal of deposits in manhole 1 ea.