Discover opportunities months before the RFP drops
Learn more →Find water resources RFP opportunities from state water resource departments, water districts, and water management agencies. Browse solicitations for water supply projects, water management systems, and water resource planning updated daily.
Abandon existing water main and replace with a new 8" water main.
Posted Date
Jan 5, 2026
Due Date
Feb 5, 2026
Release: Jan 5, 2026
Close: Feb 5, 2026
Abandon existing water main and replace with a new 8" water main.
AvailableChemicals waste water and pool.
Posted Date
Jan 1, 2026
Due Date
Jan 22, 2026
Release: Jan 1, 2026
Close: Jan 22, 2026
Chemicals waste water and pool.
AvailableCommercial water heater replacement.
Posted Date
Dec 18, 2025
Due Date
Jan 16, 2026
Release: Dec 18, 2025
Close: Jan 16, 2026
Commercial water heater replacement.
AvailableWater supply pipeline improvement.
Posted Date
Jan 3, 2026
Due Date
Jan 27, 2026
Release: Jan 3, 2026
Close: Jan 27, 2026
Water supply pipeline improvement.
AvailableProcurement of commonly used materials for water service, water main repair and maintenance, meter setting, and sewer infrastructure.
Posted Date
Jan 6, 2026
Due Date
Jan 21, 2026
Release: Jan 6, 2026
Close: Jan 21, 2026
Procurement of commonly used materials for water service, water main repair and maintenance, meter setting, and sewer infrastructure.
AvailableProcurement of a water tank maintenance program.
Posted Date
-
Due Date
Jan 15, 2026
Release: -
Close: Jan 15, 2026
Procurement of a water tank maintenance program.
AvailableThe work generally consist of the following approximate Quantities: Sanitary Sewer Service Stub, PVC, 4" and 6" - 100 LF; Water Main, Trenched, PVC, 2" - 20 LF; Water Main, Trenched, PVC, 4" - 65 LF; Water Main, Trenchless, RJ PVC, 6" - 2,120 LF; Water Main, Trenchless, RJ Ductile Iron with Nitrile Gaskets, 6" - 180 LF; Water Service Pipe, Copper, 1" – 10 LF; Water Service Pipe, Trenchless, PE, 1" - 500 LF; Water Service Pipe, Trenchless, PE, 2" - 150 LF; Water Service Corporation, 1" – 13 EA; Water Service, Corporation, 2" - 3 EA; Water Service Curb Stop and Box, 1" - 11 EA; Water Service Curb Stop and Box, 2" - 1 EA; Gate Valve, 2" - 1 EA; Gate Valve, 4” – 2 EA; Gate Valve, 6" - 9 EA; Fire Hydrant Assembly - 3 EA; Flushing Device Assembly - 1 EA; Fire Hydrant Adjustment - 1 EA; Fire Hydrant Assembly Removal - 3 EA; Valve Box Removal - 6 EA; Water Main Connection No.1 - 1 LS; Water Main Connection No. 2 - 1 LS; Water Main Connection No. 3 - 1 LS; Water Main Connection No. 4 - 1 LS; Water Main Connection No. 5 - 1 LS; Water Main Connection No. 6 - 1 LS; Water Main Connection No. 7 - 1 LS; Water Main Connection No.8 - 1 LS; Water Main Connection No. 9 - 1 LS; Removal of Sidewalk - 45 SY; Sidewalk, PCC, 4" Thick – 15 SY; Sidewalk, PCC, 6" Thick – 30 SY; Detectable Warnings – 28 SF; Pavement Removals - 200 SY; Driveway, PCC, 8” Thick – 30 SY; Granular Surfacing, 6" Thick - 75 TON; Remove and Replace Curb and Gutter, PCC, 3' Wide - 20 LF; Temporary Traffic Control - 1 LS; Seeding, Fertilizing, and Mulching, Type 1 Mixture - 1 LS; Mobilization – 1 LS.
Posted Date
Jan 2, 2026
Due Date
Jan 28, 2026
Release: Jan 2, 2026
Close: Jan 28, 2026
The work generally consist of the following approximate Quantities: Sanitary Sewer Service Stub, PVC, 4" and 6" - 100 LF; Water Main, Trenched, PVC, 2" - 20 LF; Water Main, Trenched, PVC, 4" - 65 LF; Water Main, Trenchless, RJ PVC, 6" - 2,120 LF; Water Main, Trenchless, RJ Ductile Iron with Nitrile Gaskets, 6" - 180 LF; Water Service Pipe, Copper, 1" – 10 LF; Water Service Pipe, Trenchless, PE, 1" - 500 LF; Water Service Pipe, Trenchless, PE, 2" - 150 LF; Water Service Corporation, 1" – 13 EA; Water Service, Corporation, 2" - 3 EA; Water Service Curb Stop and Box, 1" - 11 EA; Water Service Curb Stop and Box, 2" - 1 EA; Gate Valve, 2" - 1 EA; Gate Valve, 4” – 2 EA; Gate Valve, 6" - 9 EA; Fire Hydrant Assembly - 3 EA; Flushing Device Assembly - 1 EA; Fire Hydrant Adjustment - 1 EA; Fire Hydrant Assembly Removal - 3 EA; Valve Box Removal - 6 EA; Water Main Connection No.1 - 1 LS; Water Main Connection No. 2 - 1 LS; Water Main Connection No. 3 - 1 LS; Water Main Connection No. 4 - 1 LS; Water Main Connection No. 5 - 1 LS; Water Main Connection No. 6 - 1 LS; Water Main Connection No. 7 - 1 LS; Water Main Connection No.8 - 1 LS; Water Main Connection No. 9 - 1 LS; Removal of Sidewalk - 45 SY; Sidewalk, PCC, 4" Thick – 15 SY; Sidewalk, PCC, 6" Thick – 30 SY; Detectable Warnings – 28 SF; Pavement Removals - 200 SY; Driveway, PCC, 8” Thick – 30 SY; Granular Surfacing, 6" Thick - 75 TON; Remove and Replace Curb and Gutter, PCC, 3' Wide - 20 LF; Temporary Traffic Control - 1 LS; Seeding, Fertilizing, and Mulching, Type 1 Mixture - 1 LS; Mobilization – 1 LS.
AvailableConstruct Eagle Road water main crossing lining includes 28 LF 12" PVC AWWA C900 DR18 water main, 464 LF line existing 10" water main with primus DN 250/10" MD liner, 498 LF line existing 12" water main with primus DN 300/12" MD liner, 8 EA annular space leak detection connection, 552 LF abandon existing water main in place.
Posted Date
Dec 29, 2025
Due Date
Jan 21, 2026
Release: Dec 29, 2025
Close: Jan 21, 2026
Construct Eagle Road water main crossing lining includes 28 LF 12" PVC AWWA C900 DR18 water main, 464 LF line existing 10" water main with primus DN 250/10" MD liner, 498 LF line existing 12" water main with primus DN 300/12" MD liner, 8 EA annular space leak detection connection, 552 LF abandon existing water main in place.
AvailableThis RFP is for the replacement of Variable Frequency Drives (VFD) for raw water pumps.
Posted Date
Dec 15, 2025
Due Date
Jan 14, 2026
Release: Dec 15, 2025
Close: Jan 14, 2026
This RFP is for the replacement of Variable Frequency Drives (VFD) for raw water pumps.
AvailableConstruction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
AvailableProvide Water Tank Maintenance Program.
Posted Date
Dec 18, 2025
Due Date
Jan 15, 2026
Release: Dec 18, 2025
Close: Jan 15, 2026
Provide Water Tank Maintenance Program.
AvailableProvide chemical water treatment services.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Provide chemical water treatment services.
AvailableProviding human resources consulting, personnel recruitment and executive search consultant services. Meeting with city staff to develop job profiles. Developing an outreach plan for recruiting. Identifying appropriate advertising sources. Preparing brochures and advertisements. Directly contacting prospective candidates. Accepting applications and resumes. Responding to candidates. Preparing written summaries of candidate s qualifications. Developing appropriate processes, resources, and materials for use in selecting candidates and finalists. Coordinating arrangements for finalists to meet with city staff during the selection processes. Facilitating any meetings that may be required during the various stages of the process.
Posted Date
Sep 17, 2024
Due Date
Feb 28, 2029
Release: Sep 17, 2024
Close: Feb 28, 2029
Providing human resources consulting, personnel recruitment and executive search consultant services. Meeting with city staff to develop job profiles. Developing an outreach plan for recruiting. Identifying appropriate advertising sources. Preparing brochures and advertisements. Directly contacting prospective candidates. Accepting applications and resumes. Responding to candidates. Preparing written summaries of candidate s qualifications. Developing appropriate processes, resources, and materials for use in selecting candidates and finalists. Coordinating arrangements for finalists to meet with city staff during the selection processes. Facilitating any meetings that may be required during the various stages of the process.
AvailableProvide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
Posted Date
Nov 26, 2025
Due Date
Feb 5, 2026
Release: Nov 26, 2025
Close: Feb 5, 2026
Provide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
AvailableWork includes installation on existing pressurized potable-water lines and shall allow for collection of representative distribution system water samples without service interruption.
Posted Date
Dec 16, 2025
Due Date
Jan 9, 2026
Release: Dec 16, 2025
Close: Jan 9, 2026
Work includes installation on existing pressurized potable-water lines and shall allow for collection of representative distribution system water samples without service interruption.
AvailableProject consists of locker replacement, water cooler replacement. Replacement of elementary wing lockers, replacement of water coolers with new electric water coolers to comply with Michigan filter first legislation.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Project consists of locker replacement, water cooler replacement. Replacement of elementary wing lockers, replacement of water coolers with new electric water coolers to comply with Michigan filter first legislation.
AvailableThe project consists of constructing one metering building with approx. 9,700 LF of water main.
Posted Date
Dec 13, 2025
Due Date
Jan 21, 2026
Release: Dec 13, 2025
Close: Jan 21, 2026
The project consists of constructing one metering building with approx. 9,700 LF of water main.
AvailableThe City of York, Pennsylvania is soliciting proposals to select and retain a qualified vendor to provide a comprehensive Human Resources Information System (HRIS) covering payroll, time & labor, HR and benefits administration, and talent management. The contract term is two years with options to renew for up to two additional one-year periods, and the system must support complex payroll rules (multiple union groups), electronic time capture, EEO/affirmative action reporting, and third-party benefit integrations. Proposers must demonstrate relevant experience and comply with local business preferences and nondiscrimination requirements; proposals are to be submitted through the City’s procurement portal.
Posted Date
Dec 26, 2025
Due Date
Jan 14, 2026
Release: Dec 26, 2025
Close: Jan 14, 2026
The City of York, Pennsylvania is soliciting proposals to select and retain a qualified vendor to provide a comprehensive Human Resources Information System (HRIS) covering payroll, time & labor, HR and benefits administration, and talent management. The contract term is two years with options to renew for up to two additional one-year periods, and the system must support complex payroll rules (multiple union groups), electronic time capture, EEO/affirmative action reporting, and third-party benefit integrations. Proposers must demonstrate relevant experience and comply with local business preferences and nondiscrimination requirements; proposals are to be submitted through the City’s procurement portal.
AvailableThe project consists of approx 3,119 LF of 6" water main, 3,300 LF of 8" water main, 1,338 LF of 6" water main along multiple corridors. See attached file.
Posted Date
Dec 10, 2025
Due Date
Jan 20, 2026
Release: Dec 10, 2025
Close: Jan 20, 2026
The project consists of approx 3,119 LF of 6" water main, 3,300 LF of 8" water main, 1,338 LF of 6" water main along multiple corridors. See attached file.
AvailableProvide consulting services for the water master plan update.
Posted Date
Dec 23, 2025
Due Date
Jan 30, 2026
Release: Dec 23, 2025
Close: Jan 30, 2026
Provide consulting services for the water master plan update.
AvailablePublic preview limited to 5 pages
Starbridge customers get unlimited access to thousands of opportunities, contact data, and competitive intelligence.
Book a Demo →Get AI-powered buying signals and real-time alerts for water resources opportunities