Orange County

Work consists of 5000 LF conduit, f&i, open trench; 5000 SF conduit, f&i, directional bore; 5000 LF conduit, f&i, above ground; 500 LF fiber optic cable, f&i, overhead, 2-12 fibers sm; 500 LF fiber optic cable, f&i, overhead, 13-48 fibers sm; 500 LF fiber optic cable, f&i, overhead, 49-96 fibers sm; 2500 LF fiber optic cable, f&i, overhead, 97-144 fibers sm; 500 LF fiber optic cable, f&i, underground, 13-48 fibers sm; 5 EA fiber optic connection, install, splice; 5 LF multi-conductor communication cable f&i; 5 EA its cctv camera, install.

Posted Date

May 15, 2026

Due Date

Jun 18, 2026

Timeline Progress49%
Caroline County

Installation of approx two thousand two hundred (2,200) feet of one and one quarter (1. 25) inch underground conduit with accompanying twelve (12) count fiber-optic cable.

Posted Date

May 28, 2026

Due Date

Jun 29, 2026

Timeline Progress12%
Alamo Area Housing Finance Corporation

The Alamo Area Council of Governments (AACOG) is soliciting qualified vendors for RFP-26-01 to provide fiber optic cabling installation, testing, and related infrastructure services to support Joint Base San Antonio (JBSA) installations. This procurement is an Indefinite Delivery, Indefinite Quantity (IDIQ) contract covering multiple JBSA locations with specific requirements for Randolph ATCT towers. The solicitation includes an initial one-year term with four renewal options and requires compliance with site-access security and AACOG vendor documentation.

Posted Date

May 11, 2026

Due Date

Jun 12, 2026

Timeline Progress65%
Oswego County

Oswego County is soliciting qualified contractors to construct approximately 20 miles of fiber optic cable in the Central Square service area using both aerial and underground methods. The county will supply the fiber optic cable while the contractor provides all labor, equipment, and additional materials required for installation, splicing, and testing. Work is expected to be completed by December 31, 2026, and contractors must comply with New York prevailing wage laws and maintain a 5% bid bond.

Posted Date

May 26, 2026

Due Date

Jun 16, 2026

Timeline Progress27%
Salem County

Broadband Project installing Fiber Optic cable on utility poles and HDD through Salem, Cumberland and Gloucester County, NJ.

Posted Date

May 5, 2026

Due Date

Jun 12, 2026

Timeline Progress70%
City of Chesapeake

Provide qualified partners to leverage the city's connects (ccx) broadband infrastructure as a regional, carrier-grade communications platform. Ccx consists of a high-capacity, municipally owned middle-mile fiber network designed to support: carrier and wholesale transport services; dark fiber and conduit leasing; data center and interconnection ecosystem development; enterprise, government, and institutional connectivity; future fiber-to-the-premises (fttp) service expansion.

Posted Date

May 22, 2026

Due Date

Jun 18, 2026

Timeline Progress36%
DLA Aviation

Provide cell assembly, optical instrument, NSN 5855017106294, Qty 159 UI Ea

Posted Date

May 26, 2026

Due Date

Jun 2, 2026

Timeline Progress82%
Bamberg County

This solicitation seeks contractors for the rehabilitation of the Bamberg County Broadband Office building, covering systems such as roofing, electrical, plumbing, and HVAC. The project is partially funded by the USDA Reconnect Program and includes the reconstruction of an asphalt parking lot. All interested bidders must be licensed, bonded, and pre-qualified by the engineer prior to submitting their bids.

Posted Date

May 8, 2026

Due Date

Jun 18, 2026

Timeline Progress58%
The Osage Nation

Broadband Construction.

Posted Date

May 22, 2026

Due Date

Jul 2, 2026

Timeline Progress24%
Raleigh County

Work include installation of approx 3. 6 miles of broadband fiber optic cable. The cable will be installed within and adjacent to the road rights-of-way. The cable will be installed underground via directional bore construction methods to minimize ground disturbances.

Posted Date

May 25, 2026

Due Date

Jun 25, 2026

Timeline Progress22%
Clemson University

Provide osp fiber optic network builds to multiple campus sites around the state includes fiber optic cabling system installation.

Posted Date

Jun 13, 2024

Due Date

Jun 11, 2029

Timeline Progress39%
Empire State Development

Providing market-value appraisals of fiber assets throughout new york state. We are seeking bids from vendors for the excelsior broadband network, a new fiber optic line along the new york state thruway. This procurement will build a pre-qualified list of vendors that can perform fiber asset appraisal when necessary for the disposition of ebn fiber assets.

Posted Date

May 18, 2026

Due Date

Jun 12, 2026

Timeline Progress55%
Department of the Navy

The Naval Undersea Warfare Center Division, Newport (NUWC Newport) issued a combined synopsis/solicitation (RFQ N66604-26-Q-0334) to procure fiber jumper assemblies on a firm fixed price basis, with government drawings available upon request. This requirement is a total Small Business set-aside (NAICS 335921) and specifies CLINs for initial and option quantities with compliance documentation required at shipment. The solicitation was posted on SAM.gov and is an active procurement (not a grant) with offers due June 1, 2026.

Posted Date

May 22, 2026

Due Date

Jun 1, 2026

Timeline Progress97%
Air Education and Training Command

Install new fiber optic cable (FOC) from information transfer building. Require the following work, but not limited to engineer, furnish, install and test (EFI&T) 36 Strands (St) Single Mode (SM) fiber optic cable from ITB 910 to ITB 1365, including work in the underground conduit system utilizing maintenance holes, hand holes to install fiber optic cable, fiber optic distribution panel, cable racks, a network switch, UPS and engineer, furnish, install and test the new fiber optic cable system.

Posted Date

May 14, 2026

Due Date

Jun 29, 2026

Timeline Progress39%
Cheyenne-Arapaho Tribes of Oklahoma

Provide two interconnected scopes of professional services: broadband engineering, telecommunications planning, grant support, and development of a comprehensive broadband and telecommunications roadmap.

Posted Date

May 10, 2026

Due Date

Jun 5, 2026

Timeline Progress84%
DCMA Stockton

This is a combined synopsis/solicitation (RFQ) for Fiber Rope Assembly (NSN 4020013653115) issued by DLA Troop Support. The solicitation directs electronic quote submissions via the buyer-managed DIBBS site and lists delivery to DLA Distribution San Joaquin. The notice is a procurement set aside for HUBZone small businesses, and no primary solicitation document was publicly attached to the summary pages.

Posted Date

Mar 4, 2026

Due Date

Dec 31, 2026

Timeline Progress29%
Clemson University

Provide OSP fiber optic network builds to multiple campus sites.

Posted Date

Apr 15, 2024

Due Date

Jun 11, 2029

Timeline Progress41%
Department of Energy

Battelle Energy Alliance, LLC (BEA), the management and operating contractor for the Idaho National Laboratory, is soliciting Expressions of Interest for the refurbishment and modernization of a Fiber Dial Room. This Sources Sought notice aims to identify qualified vendors capable of implementing point-to-point fiber connectivity upgrades and providing relevant company experience and business size details. Interested parties must submit their responses to the designated contact by October 30, 2026, to be considered for a potential subsequent RFP.

Posted Date

Feb 25, 2026

Due Date

Oct 31, 2026

Timeline Progress39%
New York State Office for People With Developmental Disabilities

Fiber installation.

Posted Date

May 18, 2026

Due Date

Jul 7, 2026

Timeline Progress27%
Oak Ridge National Laboratory (UT-Battelle) (Contractor)

Custom-built to ORNL’s roll/core specs Unwind (mother roll) core ID 10”, cardboard core, ~12” wide roll. Rewind (product) core ID 3” on a custom aluminum spool, ~11” wide, with notched/keyway ends (machine must accept/drive/locate this spool correctly).

Posted Date

May 22, 2026

Due Date

Jun 2, 2026

Timeline Progress88%

Win More Broadband & Telecom RFPs

Get AI-powered buying signals and real-time alerts for broadband & telecom opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available