GSCA Mono County Fiber Splicing (Mono County, California Broadband Fiber-Optic Network Project)
AvailableGolden State Connect Authority (GSCA) is soliciting sealed bids for fiber splicing services as part of the Mono County Outside Plant (OSP) broadband fiber-optic network project, including splicing throughout the project area and splicing in four huts. Bids must be submitted electronically through the GSCA/OpenGov Procurement Portal and a mandatory virtual pre-bid meeting is scheduled for March 19, 2026 at 3:00pm. The solicitation is a sealed-bid Request for Bid (RFB), not a grant, with bids due April 17, 2026 at 4:00pm Pacific Time.
Posted Date
Mar 6, 2026
Due Date
Apr 17, 2026
GSCA Mono County Fiber Splicing (Mono County, California Broadband Fiber-Optic Network Project)
Release: Mar 6, 2026
Close: Apr 17, 2026
Golden State Connect Authority (GSCA) is soliciting sealed bids for fiber splicing services as part of the Mono County Outside Plant (OSP) broadband fiber-optic network project, including splicing throughout the project area and splicing in four huts. Bids must be submitted electronically through the GSCA/OpenGov Procurement Portal and a mandatory virtual pre-bid meeting is scheduled for March 19, 2026 at 3:00pm. The solicitation is a sealed-bid Request for Bid (RFB), not a grant, with bids due April 17, 2026 at 4:00pm Pacific Time.
AvailableGSCA Mono County Fiber Splicing (Mono County, California Broadband Fiber-Optic Network Project)
AvailableWork consist of 1,111 ea of splice closures/trays furnish and installation, 81 ea of termination panels and trays installation, 237 ea of fiber splices/terminations and testing, traffic control system, installation of conduit via directional bore, trenching, or micro trenching; installation of fiber-optic cable in conduit; installation of utility pull boxes within sidewalks and roadway shoulders and over-excavation (if required); restoration of concrete, pavement, striping, and landscaping; installation of splice enclosures; installation of fiber termination panels; testing of fiber splices and terminations; and installation of hut systems.
Posted Date
Mar 6, 2026
Due Date
Apr 17, 2026
GSCA Mono County Fiber Splicing (Mono County, California Broadband Fiber-Optic Network Project)
Release: Mar 6, 2026
Close: Apr 17, 2026
Work consist of 1,111 ea of splice closures/trays furnish and installation, 81 ea of termination panels and trays installation, 237 ea of fiber splices/terminations and testing, traffic control system, installation of conduit via directional bore, trenching, or micro trenching; installation of fiber-optic cable in conduit; installation of utility pull boxes within sidewalks and roadway shoulders and over-excavation (if required); restoration of concrete, pavement, striping, and landscaping; installation of splice enclosures; installation of fiber termination panels; testing of fiber splices and terminations; and installation of hut systems.
AvailableFiber Broadband Initiative (RFP)
AvailableProvide design, finance, construct, operate, and maintain a countywide underground fiber-optic broadband network.
Posted Date
Mar 15, 2026
Due Date
Apr 16, 2026
Fiber Broadband Initiative (RFP)
Release: Mar 15, 2026
Close: Apr 16, 2026
Provide design, finance, construct, operate, and maintain a countywide underground fiber-optic broadband network.
AvailableRural Broadband Fiber
Release: Mar 26, 2026
Close: Apr 9, 2026
Provide rural broadband fiber.
Golden State Connect Authority (GSCA) is issuing a Request for Bids for the construction of an Outside Plant (OSP) fiber-optic network in Mono County, California, including installation of conduit, fiber-optic cable, and handholes. Bids must be submitted through the GSCA Procurement Portal as part of a sealed-bid process that includes a mandatory pre-bid meeting and a specific Q&A timeline. Bidders must comply with all technical specifications, bonding requirements, and prevailing wage regulations as outlined in the solicitation documents.
Posted Date
Mar 6, 2026
Due Date
Apr 17, 2026
GSCA Mono County Outside Plant (OSP) Fiber Construction Project (Mono County, California Broadband Fiber-Optic Network Project)
Release: Mar 6, 2026
Close: Apr 17, 2026
Golden State Connect Authority (GSCA) is issuing a Request for Bids for the construction of an Outside Plant (OSP) fiber-optic network in Mono County, California, including installation of conduit, fiber-optic cable, and handholes. Bids must be submitted through the GSCA Procurement Portal as part of a sealed-bid process that includes a mandatory pre-bid meeting and a specific Q&A timeline. Bidders must comply with all technical specifications, bonding requirements, and prevailing wage regulations as outlined in the solicitation documents.
AvailableFiber Optic Repair Services (ITB)
AvailableWork include fiber optic repair services.
Posted Date
Feb 15, 2022
Due Date
May 5, 2027
Fiber Optic Repair Services (ITB)
Release: Feb 15, 2022
Close: May 5, 2027
Work include fiber optic repair services.
AvailableTo purchase a fiber optic draw tower.
Posted Date
Apr 1, 2026
Due Date
Apr 8, 2026
Fiber Optic Draw Tower
Release: Apr 1, 2026
Close: Apr 8, 2026
To purchase a fiber optic draw tower.
Fiber optic conduit and cabling.
Posted Date
Mar 29, 2026
Due Date
May 12, 2026
JSCC Optic Fiber Upgrades - Jefferson Campus
Release: Mar 29, 2026
Close: May 12, 2026
Fiber optic conduit and cabling.
AvailablePurchase and installation of fiber optic cable.
Posted Date
Mar 30, 2026
Due Date
Apr 10, 2026
Fiber Optic Cable Purchase & Installation (RFP)
Release: Mar 30, 2026
Close: Apr 10, 2026
Purchase and installation of fiber optic cable.
Installation of approx. 94 miles of underground fiber optic cable and all other work. Section I is for the installation of approx. 73 miles of 72 strand underground fiber optic cable to be routed from the District's Grand Island 230kV substation to the District's new Greeley 115kV substation. See attached file.
Posted Date
Mar 10, 2026
Due Date
Apr 14, 2026
Installation of Buried Fiber Optic Cable
Release: Mar 10, 2026
Close: Apr 14, 2026
Installation of approx. 94 miles of underground fiber optic cable and all other work. Section I is for the installation of approx. 73 miles of 72 strand underground fiber optic cable to be routed from the District's Grand Island 230kV substation to the District's new Greeley 115kV substation. See attached file.
AvailableWork includes 172,334 LF conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing); 790 EA handhole/vaults furnish and installation; 172,334 LF trace wire furnish and installation; 240,915 LF fiber optic cable furnish and installation into conduit system; 103,563 SF surface restoration; 1 LS hut system installation.
Posted Date
Jun 6, 2026
Due Date
Apr 17, 2026
GSCA Mono County Outside Plant (OSP) Fiber Construction Project (Mono County, California Broadband Fiber-Optic Network Project)
Release: Jun 6, 2026
Close: Apr 17, 2026
Work includes 172,334 LF conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing); 790 EA handhole/vaults furnish and installation; 172,334 LF trace wire furnish and installation; 240,915 LF fiber optic cable furnish and installation into conduit system; 103,563 SF surface restoration; 1 LS hut system installation.
AvailableDesign & build: fiber optic extension.
Posted Date
Mar 2, 2026
Due Date
Apr 15, 2026
Fiber Optic Extension To Virgil Radio Tower (RFP)
Release: Mar 2, 2026
Close: Apr 15, 2026
Design & build: fiber optic extension.
AvailableSelf-Provisioned Fiber-Optic Network
AvailableProvide a self-provisioned fiber-optic network, edge switches, firewalls, and an isp connection as part of the e-rate procurement cycle.
Posted Date
Mar 24, 2026
Due Date
Apr 13, 2026
Self-Provisioned Fiber-Optic Network
Release: Mar 24, 2026
Close: Apr 13, 2026
Provide a self-provisioned fiber-optic network, edge switches, firewalls, and an isp connection as part of the e-rate procurement cycle.
AvailablePurchase and delivery of fiber optic cable.
Posted Date
Mar 20, 2024
Due Date
Mar 21, 2029
Fiber Optic Cable, Purchase and Delivery, Term Contract (Request for Prequalifications)
Release: Mar 20, 2024
Close: Mar 21, 2029
Purchase and delivery of fiber optic cable.
AvailableInstallation of underground single mode fiber optic cable to provide high speed internet service.
Posted Date
Apr 6, 2026
Due Date
Apr 20, 2026
Fiber Optic Install at Seney NWR *SOLE SOURCE*
Release: Apr 6, 2026
Close: Apr 20, 2026
Installation of underground single mode fiber optic cable to provide high speed internet service.
AvailableProvide fiber opitc cable and equipment.
Posted Date
Mar 27, 2026
Due Date
Apr 10, 2026
Fiber Optic Cable and Materials
Release: Mar 27, 2026
Close: Apr 10, 2026
Provide fiber opitc cable and equipment.
The Naval Research Laboratory is seeking potential sources capable of providing a Silica Fiber Optic Draw Tower that meets specific technical specifications and salient characteristics. This market research notice requests interested firms to submit capability statements, technical information, and pricing details via email to assist with procurement planning. The notice explicitly states it is a Request for Information for planning purposes and does not constitute a formal solicitation or guarantee of a future contract award.
Posted Date
Apr 1, 2026
Due Date
Apr 8, 2026
Fiber Optic Draw Tower N0017326RFICM02
Release: Apr 1, 2026
Close: Apr 8, 2026
The Naval Research Laboratory is seeking potential sources capable of providing a Silica Fiber Optic Draw Tower that meets specific technical specifications and salient characteristics. This market research notice requests interested firms to submit capability statements, technical information, and pricing details via email to assist with procurement planning. The notice explicitly states it is a Request for Information for planning purposes and does not constitute a formal solicitation or guarantee of a future contract award.
Requires a portable and versatile test solution for the installation, maintenance, and troubleshooting of fiber optic networks. The system must be modular to adapt to various testing requirements and rugged enough for field use.
Posted Date
Jan 8, 2026
Due Date
Dec 12, 2026
Sources Sought - Modular Fiber Optic Test Platform
Release: Jan 8, 2026
Close: Dec 12, 2026
Requires a portable and versatile test solution for the installation, maintenance, and troubleshooting of fiber optic networks. The system must be modular to adapt to various testing requirements and rugged enough for field use.
AvailableThe U.S. Department of Defense is seeking quotes for the provision of fiber optic cable and materials under solicitation W50S8026Q0005. Interested offerors must submit their quotes through the Unison Marketplace, where a detailed list of required materials is available. The evaluation for this procurement is based solely on price, and the selected contractor must comply with standard commercial item terms and conditions.
Posted Date
Mar 27, 2026
Due Date
Apr 10, 2026
Fiber Optic Cable and Materials
Release: Mar 27, 2026
Close: Apr 10, 2026
The U.S. Department of Defense is seeking quotes for the provision of fiber optic cable and materials under solicitation W50S8026Q0005. Interested offerors must submit their quotes through the Unison Marketplace, where a detailed list of required materials is available. The evaluation for this procurement is based solely on price, and the selected contractor must comply with standard commercial item terms and conditions.
Install fiber optic cable infrastructure for the gcrta trunk line. Furnish and install all fiber optic cable hardware. The gcrta shall furnish the fiber optic backbone and drop cables. The contractor shall perform sag and tension calculations and test the entire fiber optic cable installation.
Posted Date
Mar 16, 2026
Due Date
Apr 16, 2026
Trunk Line Fiber Optic Network Construction Project 59D
Release: Mar 16, 2026
Close: Apr 16, 2026
Install fiber optic cable infrastructure for the gcrta trunk line. Furnish and install all fiber optic cable hardware. The gcrta shall furnish the fiber optic backbone and drop cables. The contractor shall perform sag and tension calculations and test the entire fiber optic cable installation.