RFP Catalog/Broadband & Telecom

Broadband & Telecom RFPs

Search broadband and telecommunications RFP opportunities from state broadband offices, telecommunications agencies, and rural development departments. Find solicitations for fiber optic networks, broadband infrastructure, and telecommunications services updated daily.

Golden State Finance Authority

Golden State Connect Authority (GSCA) is soliciting sealed bids for fiber splicing services as part of the Mono County Outside Plant (OSP) broadband fiber-optic network project, including splicing throughout the project area and splicing in four huts. Bids must be submitted electronically through the GSCA/OpenGov Procurement Portal and a mandatory virtual pre-bid meeting is scheduled for March 19, 2026 at 3:00pm. The solicitation is a sealed-bid Request for Bid (RFB), not a grant, with bids due April 17, 2026 at 4:00pm Pacific Time.

Posted Date

Mar 6, 2026

Due Date

Apr 17, 2026

Progress87%
Golden State Connect Authority (GSCA)

Work consist of 1,111 ea of splice closures/trays furnish and installation, 81 ea of termination panels and trays installation, 237 ea of fiber splices/terminations and testing, traffic control system, installation of conduit via directional bore, trenching, or micro trenching; installation of fiber-optic cable in conduit; installation of utility pull boxes within sidewalks and roadway shoulders and over-excavation (if required); restoration of concrete, pavement, striping, and landscaping; installation of splice enclosures; installation of fiber termination panels; testing of fiber splices and terminations; and installation of hut systems.

Posted Date

Mar 6, 2026

Due Date

Apr 17, 2026

Progress87%
Genesee County

Provide design, finance, construct, operate, and maintain a countywide underground fiber-optic broadband network.

Posted Date

Mar 15, 2026

Due Date

Apr 16, 2026

Progress86%
Madison County

Provide rural broadband fiber.

Posted Date

Mar 26, 2026

Due Date

Apr 9, 2026

County of Mono

Golden State Connect Authority (GSCA) is issuing a Request for Bids for the construction of an Outside Plant (OSP) fiber-optic network in Mono County, California, including installation of conduit, fiber-optic cable, and handholes. Bids must be submitted through the GSCA Procurement Portal as part of a sealed-bid process that includes a mandatory pre-bid meeting and a specific Q&A timeline. Bidders must comply with all technical specifications, bonding requirements, and prevailing wage regulations as outlined in the solicitation documents.

Posted Date

Mar 6, 2026

Due Date

Apr 17, 2026

Progress87%
Greater Miami Expressway Agency (GMX)

Work include fiber optic repair services.

Posted Date

Feb 15, 2022

Due Date

May 5, 2027

Progress80%
Department of the Navy

To purchase a fiber optic draw tower.

Posted Date

Apr 1, 2026

Due Date

Apr 8, 2026

Jefferson State Community College

Fiber optic conduit and cabling.

Posted Date

Mar 29, 2026

Due Date

May 12, 2026

Progress31%
Loyalsock Township School District

Purchase and installation of fiber optic cable.

Posted Date

Mar 30, 2026

Due Date

Apr 10, 2026

Nebraska Public Power District

Installation of approx. 94 miles of underground fiber optic cable and all other work. Section I is for the installation of approx. 73 miles of 72 strand underground fiber optic cable to be routed from the District's Grand Island 230kV substation to the District's new Greeley 115kV substation. See attached file.

Posted Date

Mar 10, 2026

Due Date

Apr 14, 2026

Progress93%
Golden State Connect Authority (GSCA)

Work includes 172,334 LF conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing); 790 EA handhole/vaults furnish and installation; 172,334 LF trace wire furnish and installation; 240,915 LF fiber optic cable furnish and installation into conduit system; 103,563 SF surface restoration; 1 LS hut system installation.

Posted Date

Jun 6, 2026

Due Date

Apr 17, 2026

Progress100%
County of Cortland

Design & build: fiber optic extension.

Posted Date

Mar 2, 2026

Due Date

Apr 15, 2026

Progress92%
Stonington Public Schools

Provide a self-provisioned fiber-optic network, edge switches, firewalls, and an isp connection as part of the e-rate procurement cycle.

Posted Date

Mar 24, 2026

Due Date

Apr 13, 2026

Progress92%
Palm Beach County

Purchase and delivery of fiber optic cable.

Posted Date

Mar 20, 2024

Due Date

Mar 21, 2029

Progress41%
U.S. Fish and Wildlife Service

Installation of underground single mode fiber optic cable to provide high speed internet service.

Posted Date

Apr 6, 2026

Due Date

Apr 20, 2026

Progress39%
National Guard Bureau (NGB)

Provide fiber opitc cable and equipment.

Posted Date

Mar 27, 2026

Due Date

Apr 10, 2026

Naval Research Laboratory (NRL)

The Naval Research Laboratory is seeking potential sources capable of providing a Silica Fiber Optic Draw Tower that meets specific technical specifications and salient characteristics. This market research notice requests interested firms to submit capability statements, technical information, and pricing details via email to assist with procurement planning. The notice explicitly states it is a Request for Information for planning purposes and does not constitute a formal solicitation or guarantee of a future contract award.

Posted Date

Apr 1, 2026

Due Date

Apr 8, 2026

U.S. Space Force

Requires a portable and versatile test solution for the installation, maintenance, and troubleshooting of fiber optic networks. The system must be modular to adapt to various testing requirements and rugged enough for field use.

Posted Date

Jan 8, 2026

Due Date

Dec 12, 2026

Progress28%
DCMA Eastern Regional Command

The U.S. Department of Defense is seeking quotes for the provision of fiber optic cable and materials under solicitation W50S8026Q0005. Interested offerors must submit their quotes through the Unison Marketplace, where a detailed list of required materials is available. The evaluation for this procurement is based solely on price, and the selected contractor must comply with standard commercial item terms and conditions.

Posted Date

Mar 27, 2026

Due Date

Apr 10, 2026

Greater Cleveland Regional Transit Authority

Install fiber optic cable infrastructure for the gcrta trunk line. Furnish and install all fiber optic cable hardware. The gcrta shall furnish the fiber optic backbone and drop cables. The contractor shall perform sag and tension calculations and test the entire fiber optic cable installation.

Posted Date

Mar 16, 2026

Due Date

Apr 16, 2026

Progress85%

Win More Broadband & Telecom RFPs

Get AI-powered buying signals and real-time alerts for broadband & telecom opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available