Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Greater Miami Expressway Agency (GMX)
Work inlcudes 800 ED channelizing device- types i, ii, di, vp, drum, or lcd; 60 ED arrow board / advance warning arrow panel; 120 ED portable changeable message sign, temporary; 1,392 ED temporary signalization and maintenance, intersection; 1,392 ED temporary traffic detection and maintenance, intersection; 26 EA inlet protection system; 329 SY removal of existing concrete; 935 SY type b stabilization; 914 SY optional base, base group 11. See attached file.
Posted Date
Apr 14, 2026
Due Date
May 27, 2026
Release: Apr 14, 2026
Greater Miami Expressway Agency (GMX)
Close: May 27, 2026
Work inlcudes 800 ED channelizing device- types i, ii, di, vp, drum, or lcd; 60 ED arrow board / advance warning arrow panel; 120 ED portable changeable message sign, temporary; 1,392 ED temporary signalization and maintenance, intersection; 1,392 ED temporary traffic detection and maintenance, intersection; 26 EA inlet protection system; 329 SY removal of existing concrete; 935 SY type b stabilization; 914 SY optional base, base group 11. See attached file.
AvailableGreater Miami Expressway Agency (GMX)
Project development and environment PD&E) study for sr 112 corridor modernization.
Posted Date
Apr 3, 2026
Due Date
May 6, 2026
Release: Apr 3, 2026
Greater Miami Expressway Agency (GMX)
Close: May 6, 2026
Project development and environment PD&E) study for sr 112 corridor modernization.
AvailableGreater Miami Expressway Agency (GMX)
Consists of required construction services including all labor, materials, equipment, traffic control, and incidentals necessary for milling and resurfacing the mainline and ramp pavements at eleven (11) segments.
Posted Date
Feb 3, 2026
Due Date
Mar 18, 2026
Release: Feb 3, 2026
Greater Miami Expressway Agency (GMX)
Close: Mar 18, 2026
Consists of required construction services including all labor, materials, equipment, traffic control, and incidentals necessary for milling and resurfacing the mainline and ramp pavements at eleven (11) segments.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Greater Miami Expressway Agency (GMX)'s board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database