RFP Catalog/Aviation Support & Regulation

Aviation Support & Regulation RFPs

Track aviation support RFP opportunities from FAA facilities, airport authorities, and aviation agencies. Discover solicitations for air traffic control systems, aviation support services, ARFF equipment, and aviation infrastructure updated daily.

Boca Raton Airport Authority

The project generally consists of architectural, structural, mechanical, and electrical improvements to the Air Traffic Control Tower (ATCT), including replacement of groundlevel ventilation louvers and HVAC upgrades; exterior waterproofing, repairs, cleaning, and painting of tower walls and cab metal panels; installation of a permanent roof over the ground-level electrical room; replacement of the cab roofing, glazing system, hurricane shutters, window seals, ground-level exterior doors, and associated components; corrosion repair and recoating of catwalk handrails; inspection and minor maintenance of fire protection systems; replacement of the fire alarm and lightning protection systems; and installation of new conduit supports at the cab roof. Bid alternates include repair of exterior stucco on concrete tie beams and columns..

Posted Date

Mar 8, 2026

Due Date

Aug 3, 2026

Timeline Progress90%
City of New Smyrna Beach

The City of New Smyrna Beach is soliciting sealed bids from qualified and licensed contractors to convert an existing septic system to a sewer system at the Air Traffic Control facility. All required documents must be completed and submitted through the City's eProcurement Portal. Bids are due by 5:00pm Eastern Time on Monday, August 10, 2026 (Solicitation No. 21-26-AIR).

Posted Date

Jul 2, 2026

Due Date

Aug 10, 2026

Timeline Progress43%
City of New Smyrna Beach

The City of New Smyrna Beach is soliciting sealed bids from qualified and licensed contractors to convert an existing septic system to a sewer system at the Air Traffic Control facility. All required documents must be completed and submitted through the City's eProcurement Portal. Bids are due by 5:00pm Eastern Time on Monday, August 10, 2026 (Solicitation No. 21-26-AIR).

Posted Date

Jul 2, 2026

Due Date

Aug 10, 2026

Timeline Progress43%
State of Oklahoma

Construct New Air Traffic Control Tower is a public solicitation to construct a new air traffic control tower in Oklahoma. The solicitation was published on 2026-06-26 and proposals are due 2026-08-05 at 10:00 AM CDT (08/05/2026 15:00:00Z). Bid documents and buyer contact information are not publicly available on the posting and require registration on the buyer portal to access full documentation.

Posted Date

Jun 26, 2026

Due Date

Aug 5, 2026

Timeline Progress57%
City of Oklahoma City

Construction of new air traffic control tower.

Posted Date

-

Due Date

Aug 5, 2026

U.S. Army Engineer District Kansas City

The U.S. Army Corps of Engineers, Kansas City District intends to award a single firm‑fixed‑price Design‑Bid‑Build contract to construct a new Air Traffic Control (ATC) Tower, including foundation, steel framing, masonry, metal roof, fire detection and suppression, HVAC, electrical and telecommunications, backup generation, elevator, associated utilities/site work, and demolition of the existing tower. The notice estimates the project magnitude at between $20,000,000 and $40,000,000, with an estimated performance period of 730 calendar days from Notice to Proceed, and specifies bid and payment bond requirements. This posting is currently a presolicitation (solicitation expected on or about 2026-07-15); the formal solicitation and any attachments will be posted on the buyer’s site (SAM/PIEE) and the listing’s inactive/archive date is 2027-06-24.

Posted Date

-

Due Date

Jun 24, 2027

U.S. Army Engineer District Louisville

The U.S. Army Corps of Engineers (USACE), Louisville District is soliciting proposals for the construction of an approximately 26,839 SF Air Traffic Control Tower (ATCT) at Fort Campbell, Kentucky. The project is a Design-Bid-Build construction effort and was funded with $45 million in federal funds for the new tower at Campbell Army Airfield. The solicitation (Notice ID W912QR26RA060) was issued on July 15, 2026, with proposals due by August 18, 2026.

Posted Date

Jul 15, 2026

Due Date

Aug 18, 2026

Timeline Progress11%
Great Lakes and Ohio River Division

Design-Bid-Build. Construction of approximately 26,839 SF air traffic control tower. See attached file.

Posted Date

Jul 15, 2026

Due Date

Aug 18, 2026

Timeline Progress11%
Hillsborough County Aviation Authority

Design build of air traffic control tower (atct) replacement.

Posted Date

Jun 18, 2026

Due Date

Jul 29, 2026

Timeline Progress75%
Air Force Life Cycle Management Center

The desired TACOS solution must deliver an integrated, scalable suite of capabilities as a survivable, expeditionary, and interoperable C2 platform providing reliable ATC services in support of Agile Combat Employment (ACE). The system shall provide, at minimum, the following capabilities: Expeditionary, Modular, and Mobile Design: The TACOS architecture shall be non-proprietary and adhere to a Modular Open Systems Approach (MOSA) governed by a Government-owned system architecture, enabling rapid integration of third-party hardware and software while remaining sensor-agnostic across current and future data sources. Open, consensus-based standards shall govern the large majority of Government-defined Key Interfaces so that hardware and software can be decoupled, and cloud-ready software containers shall allow individual capability modules (including Artificial Intelligence/ Machine Learning (AI/ML) decision aids) to be upgraded, replaced, or added without disturbing the rest of the system. The solution shall be lightweight, compact, and ruggedized for sustained operation in austere, expeditionary environments, and rapidly deployable and reconfigurable to satisfy the personnel, setup-time, and logistical-footprint demands of each operational configuration. See attached file.

Posted Date

Jul 14, 2026

Due Date

Aug 28, 2026

Timeline Progress10%
Marquette/Sawyer International Airport

Replacement of the roof system, cab window glazing and shades, cab ceiling, cab floor carpet, cab stair carpet, generator system, back-up wind and temperature/ dewpoint system and modernization of the existing elevator system.

Posted Date

Jul 1, 2026

Due Date

Jul 24, 2026

Timeline Progress77%
City of Fort Worth

The City of Fort Worth (Ref. 26-0260) is soliciting bids for the FWS Air Traffic Control Tower Generator Replacement, an ITB for construction/public works. The procurement page includes plans, specifications, and a bid proposal workbook and schedules a pre-bid conference at Fort Worth Spinks Airport; questions and intent-to-bid deadlines are posted on the buyer portal. Submissions are due Aug 13, 2026 at 2:00 PM CDT (see portal for required forms and submission instructions).

Posted Date

Jul 15, 2026

Due Date

Aug 13, 2026

Timeline Progress13%
U.S. Army Engineer District Savannah

The U.S. Army Corps of Engineers (USACE) Savannah District is soliciting bids (Solicitation W912HN26BA007, Project Number UHHZ063000) for the construction of a new Air Traffic Control Tower and Base Operations (Base Ops) facility at Robins Air Force Base in Georgia. The facility will feature reinforced concrete foundations and footings, brick veneer and insulated metal panel exterior walls, and a structural steel frame tower; functional areas include offices, a simulator room, a control cab, and supporting utility systems including a 750 kW backup generator. Responses to this Invitation for Bid (IFB) must be submitted electronically via the SAM.gov / PIEE Solicitation Module by 11:00 AM Eastern Daylight Time on July 23, 2026.

Posted Date

Jun 23, 2026

Due Date

Jul 23, 2026

Timeline Progress86%
City of St. George

Provide new sgu air traffic control tower minimum equipment.

Posted Date

Jun 23, 2026

Due Date

Jul 21, 2026

Timeline Progress92%
Federal Aviation Administration

Work includes, but is not limited to: a. Design of new slatwall console system for center console. B. Demolition and removal of existing center consoles. C. Fabrication and installation of new center console slatwall, mounts, miscellaneous accessories, and equipment. All consoles are to be secured per the ibc for seismic design (assume i factor 1. 5) d. Installation/relocation of electrical circuits and light switches to the new console. All electrical work must be in compliance with faa specification 1217h and faa-std- 019g. E. Installation of new multipoint ground plates and grounding cabling to each section of the new consoles. F. Provide electronic copies of shop drawings and plans. Drawings and plans must be in autocad. Dwg format. See attached file.

Posted Date

Mar 18, 2025

Due Date

May 15, 2028

Timeline Progress42%
U.S. Army Engineer District Seattle

The U.S. Army Corps of Engineers (USACE) Seattle District, on behalf of the 366th Contracting Squadron at Mountain Home Air Force Base, Idaho, is conducting a Sources Sought / Market Survey to identify potential construction vendors for the design and construction of a new approximately 13,941 square foot Air Traffic Control Tower (ATCT). The estimated construction magnitude is between $15 million and $35 million, and the project is anticipated to be solicited as a single firm-fixed-price construction contract. Interested small and large businesses with relevant experience in ATCT design-build or design-bid-build construction are encouraged to submit a capabilities statement by August 4, 2026.

Posted Date

Jul 14, 2026

Due Date

Aug 4, 2026

Timeline Progress22%
Texas Comptroller of Public Accounts

The Texas Comptroller of Public Accounts Statewide Procurement Division issued a solicitation for the supply of Sign and Traffic Control Supplies under Texas SmartBuy contract category 550-A2 (Traffic Control Devices). The solicitation opens on June 26, 2026 and bids are to be received by July 23, 2026, enabling vendors to supply traffic control devices, signs, sign materials, and related highway safety items to Texas state agencies and participating cooperative entities. The contract supports procurement of traffic signs and traffic control equipment meeting Texas Department of Transportation specifications.

Posted Date

Jun 26, 2026

Due Date

Jul 23, 2026

Timeline Progress84%
Virginia Department of Transportation

Provide traffic control services for on-call, as-needed, traffic control services for work being accomplished in various locations, on primary and secondary routes.

Posted Date

Jun 26, 2026

Due Date

Jul 24, 2026

Timeline Progress81%
City of Temple

Provide sign and traffic control supplies includes 25 EA stop face ME1-1 (high intensity prismatic (HIP) material only); 25 EA advanced stop face MW3-1a (high intensity prismatic (HIP) material only; 5 EA field face MR1-1-B. See attached file.

Posted Date

Jun 26, 2026

Due Date

Jul 23, 2026

Timeline Progress84%
City of Temple

Provide sign and traffic control supplies includes 25 EA stop face ME1-1 (high intensity prismatic (HIP) material only); 25 EA advanced stop face MW3-1a (high intensity prismatic (HIP) material only; 5 EA field face MR1-1-B. See attached file.

Posted Date

Jun 26, 2026

Due Date

Jul 23, 2026

Timeline Progress84%

Win More Aviation Support & Regulation RFPs

Get AI-powered buying signals and real-time alerts for aviation support & regulation opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available