Work consist of 14,120 cy of excavation, 450 lf of controlled blasting, 1,400 cy of unsuitable material excavation, 0.1097 acre mulching, 80 cy of loose riprap, 685 lf of 12" storm drain pipe, class c900 pvc, 80 lf of 18" storm drain pipe, class c905 pvc, 223 lf of 24" storm drain pipe, class c905 pvc, 108 lf of 6" irrigation sleeve, class sdr35 pvc, 10 ea of storm drain catch manhole 48", 9 ea of catch basin, 1 ea of precast sediment box - 1000 gallon, 6,780 sy of portland cement concrete pavement, 470 sy of portland cement concrete pavement, 2,460 lf of mountable roundabout curb & gutter, size 6", see attached file.