Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Swansea
208 Clara Street: Complete demolition and removal of the mobile home and all related components including chassis, axles, wheels, tires, anchors, tie-downs, skirting, utility pedestals, steps, landings, accessory structures, foundations and debris. 217 Anna Street: Complete demolition and removal of the one-story wood-frame residence, all foundations, footings, slabs, accessory structures, concrete, debris and site improvements. Both properties: Remove all trash, rubbish, brush, dead trees, fallen limbs, stumps, nuisance vegetation, concrete, asphalt, fencing and miscellaneous materials. No debris may be buried.
Posted Date
Jun 28, 2026
Due Date
Aug 3, 2026
Release: Jun 28, 2026
Village of Swansea
Close: Aug 3, 2026
208 Clara Street: Complete demolition and removal of the mobile home and all related components including chassis, axles, wheels, tires, anchors, tie-downs, skirting, utility pedestals, steps, landings, accessory structures, foundations and debris. 217 Anna Street: Complete demolition and removal of the one-story wood-frame residence, all foundations, footings, slabs, accessory structures, concrete, debris and site improvements. Both properties: Remove all trash, rubbish, brush, dead trees, fallen limbs, stumps, nuisance vegetation, concrete, asphalt, fencing and miscellaneous materials. No debris may be buried.
AvailableVillage of Swansea
Project will consist of furnishing all labor, equipment, and materials necessary to remove and replace stormwater pipe culverts, curb inlets, manholes, riprap, Class C patching, and any incidental required and necessary to complete the project. See attached file.
Posted Date
Oct 30, 2025
Due Date
Nov 10, 2025
Release: Oct 30, 2025
Village of Swansea
Close: Nov 10, 2025
Project will consist of furnishing all labor, equipment, and materials necessary to remove and replace stormwater pipe culverts, curb inlets, manholes, riprap, Class C patching, and any incidental required and necessary to complete the project. See attached file.
Village of Swansea
Work includes : 655 CY earth excavation; 100 CY rem & disp uns matl; 5 EA inlet & pipe protect; 415 SF pc conc sidewalk r; 932 SY pavement rem; 214 LF storm sew cl a 2 24; 1 EA water valves adjust; see attached file.
Posted Date
Aug 14, 2025
Due Date
Aug 26, 2025
Release: Aug 14, 2025
Village of Swansea
Close: Aug 26, 2025
Work includes : 655 CY earth excavation; 100 CY rem & disp uns matl; 5 EA inlet & pipe protect; 415 SF pc conc sidewalk r; 932 SY pavement rem; 214 LF storm sew cl a 2 24; 1 EA water valves adjust; see attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $10,000, use sole source.
Coops: Lead with a cooperative purchase (piggyback/Sourcewell). Coordinate with the Village Administrator and department head; bring to the Board if >$10,
Village of Swansea shows no evidence of approving sole source awards over $10,000.
Board meetings and strategic plans from Village of Swansea
The board discussed status updates regarding the Memorial Day event, a wellness series, and the Heartland Conservancy Master Plan. New business covered the Dracula Spectacula event. During public comment, the board voted to support a proposed Swansea Zip Code Day celebration at Clinton Hills and discussed potential logistics, including business outreach and committee formation. Additionally, members explored hosting a movie night in the park, the use of commemorative flags for recognition awards, and the implementation of new QR code signage.
The meeting included an event summary for Memorial Day and a status update on the Wellness series. Discussion topics featured planning for the upcoming Dracula Spectacula and Costume Swap events, including flyer preparation, volunteer coordination, and equipment requirements. Additionally, the Board reviewed logistics for a proposed Movie Night in the park, discussed youth archery pending a legal opinion, and addressed park reservation requests and observations regarding Shranz Park.
The board meeting agenda included status updates on the Memorial Day event, a wellness series, the Heartland Conservancy Master Plan, Dracula Spectacula, Swansea Zip Code Day, Movie Night, and park maintenance initiatives regarding trash pickup. New business items involved a proposal for an AI and community event series, the implementation of a youth archery program including equipment costs, and a park reservation request.
The board conducted a public hearing regarding a Special Use Permit application to allow the placement of recreational vehicles on mobile home lots due to the property's location in a flood-prone area. The discussion covered utility arrangements, tenant screening procedures, property maintenance standards, and flood risk management. Following the board's review of the applicant's operational practices and the site-specific constraints, the permit application was approved.
The Park Board meeting included a review of the 2025 Winter Wonderland and Santa's House event, focusing on volunteer planning and financials. Planning for 2026 events was initiated, including Memorial Day coordination, a potential October costume exchange event, and wellness series. The board also discussed the Village Park Master Plan, budget, maintenance and improvement plans, and the condition of park facilities. Additional topics covered included potential refurbishment and expansion of pickleball courts, repairs and events for the disc golf course, and a pending decision on a Clinton Hills event request.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Swansea's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge