Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Mineola
Work includes bracing of existing roof structure, demolition, and removal of existing CMU wall, disconnection and reconnection of all temporarily relocated electrical equipment, reinstallation of existing electrical equipment upon finalization of the work, bracing of the existing south wall, replacement of the existing east wall with a new grouted and reinforced CMU wall, replacement of windows, doors, and overhead doors, installation of door hardware and locks, installation of motorized overhead door operating equipment, and all other work.
Posted Date
Jul 20, 2026
Due Date
Aug 24, 2026
Release: Jul 20, 2026
Village of Mineola
Close: Aug 24, 2026
Work includes bracing of existing roof structure, demolition, and removal of existing CMU wall, disconnection and reconnection of all temporarily relocated electrical equipment, reinstallation of existing electrical equipment upon finalization of the work, bracing of the existing south wall, replacement of the existing east wall with a new grouted and reinforced CMU wall, replacement of windows, doors, and overhead doors, installation of door hardware and locks, installation of motorized overhead door operating equipment, and all other work.
AvailableVillage of Mineola
Installation of a new GAC building for PFAS treatment at the Village's Well 6 facility.
Posted Date
Jul 23, 2026
Due Date
Aug 24, 2026
Release: Jul 23, 2026
Village of Mineola
Close: Aug 24, 2026
Installation of a new GAC building for PFAS treatment at the Village's Well 6 facility.
AvailableVillage of Mineola
This is a subcontracting opportunity posted by Preferred Construction Inc. on behalf of the Incorporated Village of Mineola for the renovation of the Mineola Community Center located at 155 Washington Avenue, Mineola, NY 11501. The renovation includes improvements to the cellar, gymnasium, stage, multipurpose rooms, kitchen, lobby, hallways, closets, and west entryway, encompassing selective demolition, concrete/masonry/metal work, carpentry, thermal and moisture protection, doors and hardware, interior and exterior finishes, and equipment installation. The project has a 30% MWBE participation goal and a 6% SDVOB goal, requires compliance with State Prevailing Wage Rates and Davis-Bacon Wage Requirements, and substantial completion must occur within 285 consecutive calendar days from the Notice to Proceed.
Posted Date
-
Due Date
Jul 31, 2026
Release: -
Village of Mineola
Close: Jul 31, 2026
This is a subcontracting opportunity posted by Preferred Construction Inc. on behalf of the Incorporated Village of Mineola for the renovation of the Mineola Community Center located at 155 Washington Avenue, Mineola, NY 11501. The renovation includes improvements to the cellar, gymnasium, stage, multipurpose rooms, kitchen, lobby, hallways, closets, and west entryway, encompassing selective demolition, concrete/masonry/metal work, carpentry, thermal and moisture protection, doors and hardware, interior and exterior finishes, and equipment installation. The project has a 30% MWBE participation goal and a 6% SDVOB goal, requires compliance with State Prevailing Wage Rates and Davis-Bacon Wage Requirements, and substantial completion must occur within 285 consecutive calendar days from the Notice to Proceed.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If emergency or truly proprietary/standardization, use sole source with written justification and Board approval.
Coops: Frequently procures through OGS Centralized Contracts (NY), Sourcewell, OMNIA Partners, and NASPO ValuePoint; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
Entity: Village of Mineola, NY
Usage: Viable but situational—occasionally used for emergencies and proprietary technology.
Board meetings and strategic plans from Village of Mineola
The board authorized Phase 1 of a project focused on the identification, construction, and installation of water service lines to comply with the Lead and Copper Rule, including the appropriation of $16,215,000 and the potential issuance of bonds. Additionally, the Village Clerk was authorized to sign documentation required for state grant applications to fund lead service line inventory and replacement projects.
The meeting included a public hearing regarding a special use permit application for a property at 147 Jericho Turnpike to convert ground-floor retail space into residential apartments. The board discussed project specifics, including apartment square footage, egress safety, and parking requirements. Concerns regarding unit sizes and compliance with the Jericho Turnpike Overlay District requirements were noted, and the applicant was requested to provide clarified unit measurements and explore alternative floor plan configurations. A facade improvement program was also mentioned.
The board approved payroll, bills, and minutes from previous sessions. Key operational resolutions included a three-year renewal for a pistol range license, approval for a taxi cab license, and authorization for court clerks to attend an annual conference. Significant fiscal actions involved budget transfers for the pool fund. Other approvals focused on municipal improvements, such as the installation of a handicap parking space, declaring a firehouse bus as surplus inventory, and multiple change orders for the well one water treatment project. Personnel matters were addressed, including the hiring of a laborer, the resignation of a staff member, and the posting of new labor and water plant operator positions. Additionally, the meeting featured a presentation on building department activities and a discussion regarding the preservation of mature trees on Wellington Road.
The board approved payroll and bills, a catering permit request for a food truck, and water safety training usage at the local community pool. Personnel actions included a merit increase for an office employee and a retirement payout for a parks division laborer. The board authorized the purchase of water meters, wall radios, and pool chemicals, and approved a change order for the plumbing contract at the water treatment project. Furthermore, the board authorized payments for settled tax certiorari cases. The meeting also featured reports on local commemorative events and community updates regarding property tax deadlines.
The Board approved various community requests, including devotional processions, annual cooperative meetings, athletic tournaments, farmers markets, and band events at village facilities. Personnel actions were taken, including hiring seasonal staff for community programs, accepting retirement resignations, and promoting a staff member to Water Plant Operator. The Board authorized the removal of old fixed assets, the purchase of a new van and water meters, the procurement of security services for park and pool facilities, and the replacement of parking garage server software. Additionally, the Board authorized an engineering services contract for roadway improvements, approved the paving of a parking field, settled tax certiorari cases, and authorized participation in a national cooperative purchasing program. Reports on building department activities were presented, and various upcoming community events and anniversaries were highlighted by board members.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Mineola's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge