Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Fort Sumner
Perform fiscal audit services for FY 25-26.
Posted Date
Feb 15, 2026
Due Date
Mar 16, 2026
Release: Feb 15, 2026
Village of Fort Sumner
Close: Mar 16, 2026
Perform fiscal audit services for FY 25-26.
AvailableVillage of Fort Sumner
Work necessary to rehabilitate and reconnect the existing 6" sewer line that runs north/south through the school campus. The work includes installation of approx 570 LF of 6" HDPE DR 17; pipe bursting of approx 400 LF of existing 6" sewer line including reconnection of all associated service lines; manhole rehab for two existing 4' diameter manholes; removal and replacement of one existing 4' manhole; installation of two new 4' diameter manholes; and restoration of all existing surfaces impacted by the work. In addition, the work includes reconnection of the sewer from the elementary school building to the new 6" HDPE DR 17 sewer line and restoration of all internal building features impacted by re-routing including the replacement of 28,620 SF of flooring. The 400 LF of the existing sewer line that runs under the elementary school building is also to be abandoned and filled.
Posted Date
Feb 1, 2026
Due Date
Feb 27, 2026
Release: Feb 1, 2026
Village of Fort Sumner
Close: Feb 27, 2026
Work necessary to rehabilitate and reconnect the existing 6" sewer line that runs north/south through the school campus. The work includes installation of approx 570 LF of 6" HDPE DR 17; pipe bursting of approx 400 LF of existing 6" sewer line including reconnection of all associated service lines; manhole rehab for two existing 4' diameter manholes; removal and replacement of one existing 4' manhole; installation of two new 4' diameter manholes; and restoration of all existing surfaces impacted by the work. In addition, the work includes reconnection of the sewer from the elementary school building to the new 6" HDPE DR 17 sewer line and restoration of all internal building features impacted by re-routing including the replacement of 28,620 SF of flooring. The 400 LF of the existing sewer line that runs under the elementary school building is also to be abandoned and filled.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Village of Fort Sumner
The document pertains to the regular meeting scheduled for January 13, 2020. Since the provided content consists only of metadata links and document references (Agendas and Minutes), specific discussion topics from the meeting body are not available for extraction.
The council meeting focused on the consideration and approval of the agenda, and a discussion and approval of the NASA CSBF contract with the village of Fort Sumner. The meeting concluded with a motion to adjourn.
The council meeting addressed several key issues. Discussion included the approval of the meeting agenda and minutes from previous meetings. A significant portion of the meeting focused on the animal control contract, including the selection of a new contractor and a review of insurance requirements. The council also considered filling a vacancy in the street department, ultimately deciding to advertise the position for three weeks. The meeting included discussion and approval of the hiring of a senior center director, a contract for CDBG administrative services, and a review of COVID-19 procedures and plans, including the potential reopening of the community house for rentals.
The council meeting addressed several key items. The agenda included consideration and approval of the minutes from previous meetings, a public hearing for proposed ordinance 417 regarding business registration, and the approval of the 2020 audit report from Southwest Accounting Solutions. Contracts for on-call engineering services with Bolton & Corbin and Dennis Engineering were approved. Lease and wage agreements with CSBF were approved, along with an interim lease agreement. A NASA lease agreement was discussed, including the possibility of the village acting as a fiscal agent for local vendors. A resolution declaring the village an emergency area was approved, along with budget adjustments for the ambulance and airport funds. Finally, new hires for the PMS were approved, along with an extension for delinquent utility accounts.
The council meeting addressed several key items. A sewer rate study was adopted, recommending option C with a $26 base rate and a $2.50 per thousand gallon usage charge. The meeting also involved a reconsideration of an RFP for wastewater treatment plant improvements, resulting in a decision to allow negotiations with Bohannon Houston. Discussion included the timeline for applications for a senior center director position, extending the deadline to October 7th. Approval was given to pay temporary employee Sonia Williams until October 9th. A resolution (20-35) concerning the senior ICIP plan was adopted. Finally, the council discussed a billboard for the Billy the Kid museum.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Fort Sumner's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Village of Fort Sumner's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database