Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Turtle Mountain Band of Chippewa Indians
Demolition and site preparation. Sidewalk paving. Seeding and mulching.
Posted Date
Jul 2, 2026
Due Date
Jul 27, 2026
Release: Jul 2, 2026
Turtle Mountain Band of Chippewa Indians
Close: Jul 27, 2026
Demolition and site preparation. Sidewalk paving. Seeding and mulching.
AvailableTurtle Mountain Band of Chippewa Indians
Work includes furnishing all labor, equipment, and materials required for the construction of the following: rehabilitation of an existing waste water treatment system consisting of a 9.1 acre primary cell and 8.1 acre secondary cell, a new 3.43 acre constructed wetland, new wetland access road, cut volume for constructed wetland site work is 21,250 cubic yards, wetland inlet and outlet flow control structures, 1,823 feet of 8-inch PVC SDR 21 gravity sewer main, new inlet manhole and connection to existing sewer force main, new lagoon structures, removal and abandonment of existing lagoon structures, 4,000 cubic yards of rip-rap, removal of existing fence, 4,580 linear feet of new chain link fence, and other related items to complete the project.
Posted Date
Jun 22, 2026
Due Date
Jul 16, 2026
Release: Jun 22, 2026
Turtle Mountain Band of Chippewa Indians
Close: Jul 16, 2026
Work includes furnishing all labor, equipment, and materials required for the construction of the following: rehabilitation of an existing waste water treatment system consisting of a 9.1 acre primary cell and 8.1 acre secondary cell, a new 3.43 acre constructed wetland, new wetland access road, cut volume for constructed wetland site work is 21,250 cubic yards, wetland inlet and outlet flow control structures, 1,823 feet of 8-inch PVC SDR 21 gravity sewer main, new inlet manhole and connection to existing sewer force main, new lagoon structures, removal and abandonment of existing lagoon structures, 4,000 cubic yards of rip-rap, removal of existing fence, 4,580 linear feet of new chain link fence, and other related items to complete the project.
AvailableTurtle Mountain Band of Chippewa Indians
Seal cracks throughout approx. 8,200 SY of existing parking lot. Work includes surface cleaning/prep, routing or cleaning cracks as needed, application of approved crack sealant, removal of excess material, and protection of sealed areas until cured.
Posted Date
Jun 15, 2026
Due Date
Jun 29, 2026
Release: Jun 15, 2026
Turtle Mountain Band of Chippewa Indians
Close: Jun 29, 2026
Seal cracks throughout approx. 8,200 SY of existing parking lot. Work includes surface cleaning/prep, routing or cleaning cracks as needed, application of approved crack sealant, removal of excess material, and protection of sealed areas until cured.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge