Summary
Work includes furnishing all labor, equipment, and materials required for the construction of the following: rehabilitation of an existing waste water treatment system consisting of a 9.1 acre primary cell and 8.1 acre secondary cell, a new 3.43 acre constructed wetland, new wetland access road, cut volume for constructed wetland site work is 21,250 cubic yards, wetland inlet and outlet flow control structures, 1,823 feet of 8-inch PVC SDR 21 gravity sewer main, new inlet manhole and connection to existing sewer force main, new lagoon structures, removal and abandonment of existing lagoon structures, 4,000 cubic yards of rip-rap, removal of existing fence, 4,580 linear feet of new chain link fence, and other related items to complete the project.