Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Tulalip Tribes
A consultant to provide planning support to Tribal staff, leadership, and community members by leveraging expertise from project partners and resources, the Tulalip team, and independent research to prepare a shoreline improvement feasibility report for the spee-bi-dah neighborhood.
Posted Date
Jul 8, 2026
Due Date
Jul 27, 2026
Release: Jul 8, 2026
Tulalip Tribes
Close: Jul 27, 2026
A consultant to provide planning support to Tribal staff, leadership, and community members by leveraging expertise from project partners and resources, the Tulalip team, and independent research to prepare a shoreline improvement feasibility report for the spee-bi-dah neighborhood.
AvailableTulalip Tribes
The project constructs seven roundabouts replacing signalized intersections along both corridors. The project also construct a new bridge over Coho Creek on 88th Street NE (replacing an existing culvert), new and replaced retaining walls, new stormwater treatment and conveyance systems, enhancements to Coho Creek and surrounding critical areas, landscaping, illumination, permanent signing, ITS, and other work.
Posted Date
-
Due Date
Aug 10, 2026
Tulalip Tribes
Close: Aug 10, 2026
The project constructs seven roundabouts replacing signalized intersections along both corridors. The project also construct a new bridge over Coho Creek on 88th Street NE (replacing an existing culvert), new and replaced retaining walls, new stormwater treatment and conveyance systems, enhancements to Coho Creek and surrounding critical areas, landscaping, illumination, permanent signing, ITS, and other work.
AvailableTulalip Tribes
Demolition and removal of an existing surface-level asphalt parking lot and its associated stormwater infrastructure. Site preparation, grading, and earthwork to accommodate the new building footprint.Construction of a new prefabricated engineered gymnasium building.Installation of new concrete walkways, stairs, ADA parking stalls, and associated landscaping. Routing and installation of new utility services, including water services and sanitary sewer routing beneath a gravel access road. Stormwater reroutes, including adding new catch basins and conveyance piping to match existing drainage patterns. Implementation of a Wetland Buffer Mitigation Plan involving the planting of native vegetation and shrubs to restore areas temporarily disturbed by construction activity.
Posted Date
Jun 17, 2026
Due Date
Jul 1, 2026
Release: Jun 17, 2026
Tulalip Tribes
Close: Jul 1, 2026
Demolition and removal of an existing surface-level asphalt parking lot and its associated stormwater infrastructure. Site preparation, grading, and earthwork to accommodate the new building footprint.Construction of a new prefabricated engineered gymnasium building.Installation of new concrete walkways, stairs, ADA parking stalls, and associated landscaping. Routing and installation of new utility services, including water services and sanitary sewer routing beneath a gravel access road. Stormwater reroutes, including adding new catch basins and conveyance piping to match existing drainage patterns. Implementation of a Wetland Buffer Mitigation Plan involving the planting of native vegetation and shrubs to restore areas temporarily disturbed by construction activity.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Executive Director of Natural and Cultural Resources
Premium
Access the largest public sector contact database
© 2026 Starbridge