Cowlitz Way & NW 41st Safety Improvements (Request for Proposal)
Posted
Nov 10, 2026
Jan 13, 2027
The work involves: the installation of about 250 FT (to be verified in the field) of guardrail run, including the end termini treatment along the inner curve at this location and some chevron (guide) signs on the out curve of at this location. the installation of eight (8) new Solar Powered Rapid Rectangular Flashing Beacon (RRFB) Crosswalk Signs.


