Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Jamestown S'Klallam Tribe
Supply logs without root wads and logs with root wads for the floodplain phase of the lower big river bridge replacement project.
Posted Date
Oct 22, 2024
Due Date
Dec 19, 2024
Release: Oct 22, 2024
Jamestown S'Klallam Tribe
Close: Dec 19, 2024
Supply logs without root wads and logs with root wads for the floodplain phase of the lower big river bridge replacement project.
Jamestown S'Klallam Tribe
The floodplain phase of the lower bridge replacement project includes realignment of 4,591 FT of the river back into its historic channel location, construction of 2,262 FT of new river side channels, regrading and restoration of 800 feet of the existing river channel, construction of 684 FT of a new south setback levee, removal of 765 FT of the existing street, removal of 928 FT of the existing avenue, removal of the existing south levee from street west, removal of 1,861 FT of the existing north levee, removal of concrete walls and the regrading of the south shoreline of the new river channel at station 0+00, construction of a new road and bridge to access the power towers, and construction of scour pads around existing BPA power poles.
Posted Date
Oct 22, 2024
Due Date
Dec 19, 2024
Release: Oct 22, 2024
Jamestown S'Klallam Tribe
Close: Dec 19, 2024
The floodplain phase of the lower bridge replacement project includes realignment of 4,591 FT of the river back into its historic channel location, construction of 2,262 FT of new river side channels, regrading and restoration of 800 feet of the existing river channel, construction of 684 FT of a new south setback levee, removal of 765 FT of the existing street, removal of 928 FT of the existing avenue, removal of the existing south levee from street west, removal of 1,861 FT of the existing north levee, removal of concrete walls and the regrading of the south shoreline of the new river channel at station 0+00, construction of a new road and bridge to access the power towers, and construction of scour pads around existing BPA power poles.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Jamestown S'Klallam Tribe's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database