Peckman River Retaining Wall and Riverbank Armoring - 615 Pompton Avenue
Jul 23, 2026
Closes
Aug 13, 2026
The work will include approx 30 sy of 4" dense graded aggregate base course; 160 sy of hma milling, 3-6" thick; 40 tn of 4" thick hma surface course; 88 lf of 4" wide traffic stripes; 45 lf of granite block curb; 1 ls of mobilization; 1 ls of soil erosion and sediment control; 1 ls of traffic control devices; 1 ls of clearing site; 1 ls of shoring; 2 cy of excavation, test pits (if and where directed); 1 ls of modular concrete block retaining wall; 20 un of riprap pinning, variable length (if & where directed); 175 lf of 4' high black chain link fence; 45 lf of granite block curb; 6 un of bollard; 50 sy of topsoiling, 4" thick; 50 sy of fertilizing and seeding; 50 sy of straw mulching; 20 un of live stakes.