Tenderfoot Area Waterline Replacement Phase II (Request for Quotes)
Aug 6, 2026
Closes
Sep 8, 2026
Work includes construction of approximately 3,330 LF of 8" and 14" c-900 PVC pipe, 160 LF of 8 and 14" directional boring hdpe dr 11 dips HDPE, isolation valves, hydrants, meter coil pits, trench groundwater dewatering, rock excavation, lien fill encasement, asphalt patching, concrete curb and sidewalk replacement as re- quired to provide a complete and functional project.