Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Town of Ramseur's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Finance Director
Town Clerk/Finance Officer
Operator in Responsible Charge (ORC), Wastewater Treatment Plant
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Town of Ramseur
Installation of approx. 19,213 LF of 2" to 10" waterlines via open cut, 1,932 LF of 6" and 8" waterlines via pipe bursting, 81 LF of 2" and 6" waterline via direct bore, and 207 LF of bore and jack, including fire hydrants and valves and associated appurtenances.
Posted Date
Oct 2, 2025
Due Date
Jan 15, 2026
Release: Oct 2, 2025
Town of Ramseur
Close: Jan 15, 2026
Installation of approx. 19,213 LF of 2" to 10" waterlines via open cut, 1,932 LF of 6" and 8" waterlines via pipe bursting, 81 LF of 2" and 6" waterline via direct bore, and 207 LF of bore and jack, including fire hydrants and valves and associated appurtenances.
AvailableTown of Ramseur
Work includes: 1 ammonia feed system - add new aqua ammonia chemical feed system with injection into the finished water main after the high service pumps; one (1) aqua ammonia storage totes, new chemical metering pump skid, and associated chemical piping and valves housed in a new fiberglass reinforced plastic building on a concrete pad; 2 sedimentation basin sludge removal system - add new traveling suction type sludge removal system to each of the existing two (2) sedimentation basins, sludge will discharge via automated valves to discharge box and to backwah holding/sludge thickener tank; 3 replacement of the flash mix motor and flocculation mix motors with new motors on the existing units; 4 replace existing buried decant valves at backwash holding /sludge thickener tank as shown on drawings, install new ultrasonic level probe in the existing tank for liquid level measurement.
Posted Date
Jan 18, 2025
Due Date
Feb 13, 2025
Release: Jan 18, 2025
Town of Ramseur
Close: Feb 13, 2025
Work includes: 1 ammonia feed system - add new aqua ammonia chemical feed system with injection into the finished water main after the high service pumps; one (1) aqua ammonia storage totes, new chemical metering pump skid, and associated chemical piping and valves housed in a new fiberglass reinforced plastic building on a concrete pad; 2 sedimentation basin sludge removal system - add new traveling suction type sludge removal system to each of the existing two (2) sedimentation basins, sludge will discharge via automated valves to discharge box and to backwah holding/sludge thickener tank; 3 replacement of the flash mix motor and flocculation mix motors with new motors on the existing units; 4 replace existing buried decant valves at backwash holding /sludge thickener tank as shown on drawings, install new ultrasonic level probe in the existing tank for liquid level measurement.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.