Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Town of Pineville's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Town of Pineville
Work include 45 LF 8" dip cl 50; 1,270 LF 8" dip cl 50 restraint jt; 290 LF 8" dip cl 50 w/nitrile gskt; 60 LF 8" dip cl 50 b&s jt; 36,766 LF pipeline cleaning; 36,766 LF pipeline disinfection; 48 EA 8" valve; 19 EA 8" connection fire hyd; 1,325 LF 10" directional drill stream crossing; 25 LF 2" trenchless stream crossing; 8,000 SY asphalt milling; 160 LF curb and gutter replacement; 212 EA 3/4" connection; 3,650 LF 3/4" add service line; 155 LF 1" sl creek crossing; 224 EA meter set. See outside link for more.
Posted Date
Jan 6, 2026
Due Date
Feb 26, 2026
Release: Jan 6, 2026
Town of Pineville
Close: Feb 26, 2026
Work include 45 LF 8" dip cl 50; 1,270 LF 8" dip cl 50 restraint jt; 290 LF 8" dip cl 50 w/nitrile gskt; 60 LF 8" dip cl 50 b&s jt; 36,766 LF pipeline cleaning; 36,766 LF pipeline disinfection; 48 EA 8" valve; 19 EA 8" connection fire hyd; 1,325 LF 10" directional drill stream crossing; 25 LF 2" trenchless stream crossing; 8,000 SY asphalt milling; 160 LF curb and gutter replacement; 212 EA 3/4" connection; 3,650 LF 3/4" add service line; 155 LF 1" sl creek crossing; 224 EA meter set. See outside link for more.
AvailableTown of Pineville
Work include8,140 LF 10" PVC AWWA PC305; 17 LF 10" creek crossing; 10" dip RJ; 120 LF 10" dip rj; 65 LF 10" highway crossing; 12 EA 10" gate valve & box; 66 EA 3/4" service connection; 100 lF 3/4" additional service line; 75 LF 3/4" service line (highway crossing); 2 EA existing waterline cutting & capping; 66 EA existing service reconnection; 66 EA meter settings; 4 fire hydrant; 50 EA bollards for fire hydrants; 100 SY asphalt overlays (2 thick)
Posted Date
Jan 6, 2026
Due Date
Feb 26, 2026
Release: Jan 6, 2026
Town of Pineville
Close: Feb 26, 2026
Work include8,140 LF 10" PVC AWWA PC305; 17 LF 10" creek crossing; 10" dip RJ; 120 LF 10" dip rj; 65 LF 10" highway crossing; 12 EA 10" gate valve & box; 66 EA 3/4" service connection; 100 lF 3/4" additional service line; 75 LF 3/4" service line (highway crossing); 2 EA existing waterline cutting & capping; 66 EA existing service reconnection; 66 EA meter settings; 4 fire hydrant; 50 EA bollards for fire hydrants; 100 SY asphalt overlays (2 thick)
AvailableTown of Pineville
Existing water systems renovations for the town existing water system renovations for the town will be upgraded new radio read meters for all customers, new trailer and mini excavator, the repair or replace approx. 25 fire fire hydrants install 4 master meters for water accountability, and the replacement of existing 6" line with new 10" line from downtown toward booster station site includes 8,140 LF 10" PVC AWWA PC305, 17 LF 10" creek crossing, 120 LF 10" DIP RJ, 65 LF 10" highway crossing, 66 EA 3/4" service connection, 100 LF 3/4" additional service line, 2 EA existing waterline cutting & capping, 1 LS pipeline cleaning, 1 LS pipeline disinfection.
Posted Date
Aug 14, 2025
Due Date
Sep 16, 2025
Release: Aug 14, 2025
Town of Pineville
Close: Sep 16, 2025
Existing water systems renovations for the town existing water system renovations for the town will be upgraded new radio read meters for all customers, new trailer and mini excavator, the repair or replace approx. 25 fire fire hydrants install 4 master meters for water accountability, and the replacement of existing 6" line with new 10" line from downtown toward booster station site includes 8,140 LF 10" PVC AWWA PC305, 17 LF 10" creek crossing, 120 LF 10" DIP RJ, 65 LF 10" highway crossing, 66 EA 3/4" service connection, 100 LF 3/4" additional service line, 2 EA existing waterline cutting & capping, 1 LS pipeline cleaning, 1 LS pipeline disinfection.