Mountain Meadow Water Tank Improvements RFP
Posted
Oct 13, 2026
Nov 23, 2026
Work includes removal of approx. 143 LF of existing waterline and one existing valve; installation of approx. 245 LF of 4" schedule 40 pvc waterline and 114 LF of 8" schedule 40 pvc waterline; installation of a precast underground vault; connections to the existing irrigation and waterline systems; and installation of a water truck fill station. Work includes removal of approx. 143 LF of existing waterline and one existing valve; installation of approx. 245 LF of 4" schedule 40 pvc waterline and 114 LF of 8" schedule 40 pvc waterline; installation of a precast underground vault; connections to the existing irrigation and waterline systems; and installation of a water truck fill station. See outside link.