Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Grand Ridge
Project consists of replacing existing equipment on an in-kind basis at the wastewater treatment plant (wwtp) and performing various upgrades at four (4) lift stations. Improvements at the lift stations include the replacement of existing pumps and associated electrical control panels at all four (4) lift stations. Additional upgrades include the installation of a permanent backup generator at one (1) lift station and the installation of bypass pump at three (3) lift stations. In addition, supervisory control and data acquisition (scada) capabilities will be added to all four (4) lift stations receiving upgrades, as well as to the wastewater treatment plant, to enhance system monitoring, control, and overall operational reliability.
Posted Date
Mar 25, 2026
Due Date
Apr 30, 2026
Release: Mar 25, 2026
Town of Grand Ridge
Close: Apr 30, 2026
Project consists of replacing existing equipment on an in-kind basis at the wastewater treatment plant (wwtp) and performing various upgrades at four (4) lift stations. Improvements at the lift stations include the replacement of existing pumps and associated electrical control panels at all four (4) lift stations. Additional upgrades include the installation of a permanent backup generator at one (1) lift station and the installation of bypass pump at three (3) lift stations. In addition, supervisory control and data acquisition (scada) capabilities will be added to all four (4) lift stations receiving upgrades, as well as to the wastewater treatment plant, to enhance system monitoring, control, and overall operational reliability.
AvailableTown of Grand Ridge
Work includes two restrooms, two offices, common area, meeting room, mechanical room, kitchen, and bunker gear storage room. Site work includes clearing and grubbing, earthwork, retention pond, reinforced concrete pavement with driveway, fencing and sodding and underground utility construction.
Posted Date
Oct 8, 2025
Due Date
Nov 18, 2025
Release: Oct 8, 2025
Town of Grand Ridge
Close: Nov 18, 2025
Work includes two restrooms, two offices, common area, meeting room, mechanical room, kitchen, and bunker gear storage room. Site work includes clearing and grubbing, earthwork, retention pond, reinforced concrete pavement with driveway, fencing and sodding and underground utility construction.
Town of Grand Ridge
Replace the emergency generators at wells two and three. Additionally, the damaged SCADA system will be replaced. A new operational SCADA communications system will allow town staff to operate and monitor the system remotely in order to ensure their safety during future storm events.
Posted Date
Oct 6, 2024
Due Date
Nov 7, 2024
Release: Oct 6, 2024
Town of Grand Ridge
Close: Nov 7, 2024
Replace the emergency generators at wells two and three. Additionally, the damaged SCADA system will be replaced. A new operational SCADA communications system will allow town staff to operate and monitor the system remotely in order to ensure their safety during future storm events.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Town of Grand Ridge's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database