Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Bermuda Run
The Town of Bermuda Run is soliciting bids for construction of a sidewalk along a 1.7-mile stretch of Bermuda Run Drive and Riverbend Drive in Bermuda Run East, with Phases 1 and 2 combined into one project. The work includes sidewalk construction, drainage features, utility adjustments, erosion and sediment control, site maintenance, and compliance with OSHA and applicable state and local standards. This is an open construction solicitation as of July 22, 2026, with bids due August 11, 2026; no grant-program language was identified.
Posted Date
Jul 20, 2026
Due Date
Aug 11, 2026
Release: Jul 20, 2026
Town of Bermuda Run
Close: Aug 11, 2026
The Town of Bermuda Run is soliciting bids for construction of a sidewalk along a 1.7-mile stretch of Bermuda Run Drive and Riverbend Drive in Bermuda Run East, with Phases 1 and 2 combined into one project. The work includes sidewalk construction, drainage features, utility adjustments, erosion and sediment control, site maintenance, and compliance with OSHA and applicable state and local standards. This is an open construction solicitation as of July 22, 2026, with bids due August 11, 2026; no grant-program language was identified.
AvailableTown of Bermuda Run
The Town of Bermuda Run is soliciting bids for construction of a sidewalk along a 1.7-mile stretch of Bermuda Run Drive and Riverbend Drive in Bermuda Run East, with Phases 1 and 2 combined into one project. The work includes sidewalk construction, drainage features, utility adjustments, erosion and sediment control, site maintenance, and compliance with OSHA and applicable state and local standards. This is an open construction solicitation as of July 22, 2026, with bids due August 11, 2026; no grant-program language was identified.
Posted Date
Jul 20, 2026
Due Date
Aug 11, 2026
Release: Jul 20, 2026
Town of Bermuda Run
Close: Aug 11, 2026
The Town of Bermuda Run is soliciting bids for construction of a sidewalk along a 1.7-mile stretch of Bermuda Run Drive and Riverbend Drive in Bermuda Run East, with Phases 1 and 2 combined into one project. The work includes sidewalk construction, drainage features, utility adjustments, erosion and sediment control, site maintenance, and compliance with OSHA and applicable state and local standards. This is an open construction solicitation as of July 22, 2026, with bids due August 11, 2026; no grant-program language was identified.
AvailableTown of Bermuda Run
Work includes construction surveying, select tree removal 2 EA, grading, removal of existing asphalt pavement 32 SY, removal of existing concrete pavement 28 SY, breaking of existing asphalt pavement 32 SY, breaking of existing concrete pavement 28 SY, foundation conditioning material, minor structures 10 Ton, foundation conditioning material geotextile 20 SY, 24" hdpe drainage pipe 20 LF, 24" rc culv class iv 40 LF, pipe removal 58 LF, asphalt plant mix, pavement repair 20 Ton, reinforced endwalls 1.5 CY, masonry drainage structures 2 EA, 4" concrete sidewalk 90 SY. See attached file.
Posted Date
Oct 7, 2025
Due Date
Oct 29, 2025
Release: Oct 7, 2025
Town of Bermuda Run
Close: Oct 29, 2025
Work includes construction surveying, select tree removal 2 EA, grading, removal of existing asphalt pavement 32 SY, removal of existing concrete pavement 28 SY, breaking of existing asphalt pavement 32 SY, breaking of existing concrete pavement 28 SY, foundation conditioning material, minor structures 10 Ton, foundation conditioning material geotextile 20 SY, 24" hdpe drainage pipe 20 LF, 24" rc culv class iv 40 LF, pipe removal 58 LF, asphalt plant mix, pavement repair 20 Ton, reinforced endwalls 1.5 CY, masonry drainage structures 2 EA, 4" concrete sidewalk 90 SY. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable—move on.
Coops: Suggest exploring NC Statewide Term Contracts, NCDIT IT contracts, OMNIA Partners, or Sourcewell to avoid a formal bid.
Town of Bermuda Run: No evidence of sole source awards; treat this path as non-viable.
Board meetings and strategic plans from Town of Bermuda Run
The meeting included the selection of a temporary Board Chair and the addition of a council vacancy item to the agenda. Informational updates were provided regarding 2026 town initiatives and projects, including speed studies, land use, and zoning. The council discussed gate operations, the Christmas in Bermuda Run event, and received a quarterly budget update. Additionally, the council reviewed the Mayoral transition and upcoming council vacancy, and viewed a draft budget presentation.
The council meeting included a presentation of the FY24/25 audit. Informational items were presented, covering the 2026 town initiatives and projects, an update from the Winston-Salem Transportation Planning Organization TAC, a 2026 CIBR update, a quarterly budget review, preparations for the upcoming 2026 town council planning session, and the selection process for the planning board candidates.
The Town Council discussed preparations for the annual Christmas event, reviewed an Asset Inventory Assessment, and covered logistical plans for the upcoming organizational meeting. Key items included a quarterly budget financial update, the status of a pending gate access contract, and updates on the 2025 street paving project following bid negotiations. Additionally, the Council addressed a draft solicitation ordinance, heard updates on land use and zoning, received details regarding upcoming leaf pickup services, and reviewed progress on the BR East Pedestrian Plan.
The Town Council reviewed a presentation from Duke Energy and heard citizen concerns regarding the pedestrian pathway project. Key actions included the approval of a budget amendment to reallocate funds for seasonal decor and event expenses, and the appointment of three new members to the Planning Board. Staff provided updates on upcoming infrastructure projects and planning sessions. Additionally, the Mayor announced his resignation during the meeting.
The council meeting included a presentation from the executive director of the Hero Center regarding their mission of providing recreational therapy, transitional housing, and emergency support for veterans, as well as the upcoming charity golf tournament. Additionally, the meeting featured a public comment period where residents requested a one-year moratorium on data center development to study the potential impacts on infrastructure, utilities, and community character.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Bermuda Run's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge