Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Arlington
Seeking sealed proposals from qualified contractors for the removal and replacement of the suspended ceiling system and lighting fixtures in the Arlington town hall meeting room located at: Arlington town hall.
Posted Date
May 19, 2026
Due Date
Jun 9, 2026
Release: May 19, 2026
Town of Arlington
Close: Jun 9, 2026
Seeking sealed proposals from qualified contractors for the removal and replacement of the suspended ceiling system and lighting fixtures in the Arlington town hall meeting room located at: Arlington town hall.
AvailableTown of Arlington
Installation of insulation for energy efficiency at the town hall. Walls above second floor ceiling: install mineral wool batt insulation (r-19) at perimeter walls for the space between the second-floor finish ceiling and attic floor. Insulation must be secured in place and installed tight. See attachment a sketch. Install 12 blown-in cellulose (r-30) within the attic floor framing. Remove existing decking as required to provide even coverage to the required depth. See attachment a sketch. Remove all flammable items stored in the attic & provide to the owner for use or dispose. If any knob and tube wiring is encountered, confirm it is not active and remove it. Provide an allowance for this work. The overall building size is roughly 36 -6 x 56 -0. All dimensions are approximate. Contractor shall verify field measurements.
Posted Date
May 19, 2026
Due Date
Jun 9, 2026
Release: May 19, 2026
Town of Arlington
Close: Jun 9, 2026
Installation of insulation for energy efficiency at the town hall. Walls above second floor ceiling: install mineral wool batt insulation (r-19) at perimeter walls for the space between the second-floor finish ceiling and attic floor. Insulation must be secured in place and installed tight. See attachment a sketch. Install 12 blown-in cellulose (r-30) within the attic floor framing. Remove existing decking as required to provide even coverage to the required depth. See attachment a sketch. Remove all flammable items stored in the attic & provide to the owner for use or dispose. If any knob and tube wiring is encountered, confirm it is not active and remove it. Provide an allowance for this work. The overall building size is roughly 36 -6 x 56 -0. All dimensions are approximate. Contractor shall verify field measurements.
AvailableTown of Arlington
Recreation Park Pedestrian Access.
Posted Date
Apr 18, 2026
Due Date
May 13, 2026
Release: Apr 18, 2026
Town of Arlington
Close: May 13, 2026
Recreation Park Pedestrian Access.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; pivot to state/coop contracts instead.
Coops: First, check if your solution is on a State of Vermont contract or a cooperative like Sourcewell; if yes, route the purchase through it to avoid bidding.
Town of Arlington avoids traditional sole-sourcing. No specific sole-source dollar threshold is cited.
Board meetings and strategic plans from Town of Arlington
The board discussed several infrastructure and property-related matters. Updates were provided regarding the bidding and inspection process for the 7A sidewalk and the repairs for the covered bridge. The board reviewed a proposed adjustment to a highway turnaround to accommodate land acquisition by the National Forest. Additionally, a request to expand a private property into the town's highway right-of-way was addressed, with the board advising against the expansion due to road safety and sightline concerns. Wastewater investigation test pits were also discussed, and the board considered future infrastructure needs including potential fiber optic installation and concrete work at the local park.
The meeting included discussions on Highway Department projects, specifically the 7A sidewalk pre-bid meeting, repairs to a historic covered bridge including potential fireproof painting, and re-routing a highway turnaround due to property acquisition by the National Forest. The board also discussed a property owner's request to expand a structure into the highway right-of-way near the closed Benedict Crossing Bridge, and updates on a wastewater investigation involving test pits at the John Smith property. Additionally, park and recreation facility improvements were discussed, including concrete work and plans for installing fiber optic cable for security and infrastructure needs.
The board discussed ongoing highway projects, including upcoming transportation paperwork, paving grant applications, and culvert replacements on Old West Road and Buck Hill Road. The primary focus of the meeting was the potential replacement or repair of the Benedict Crossing bridge, weighing the options between securing state funding, bond initiatives, or a decade-long savings strategy. The board also addressed the broader infrastructure prioritization, including a new firehouse and a municipal wastewater system, and explored the possibility of conducting a non-binding referendum in the fall to gauge voter sentiment on financing these capital projects.
The meeting included reports from the water operator regarding maintenance projects, such as clearing brush and vines around the storage tank and upgrading site infrastructure like doors and propane tanks. The board approved expenditures for a new double door and a propane tank upgrade. Financial discussions focused on managing aged receivables, with the board confirming a proactive approach to handling unpaid utility bills through a collection agency, including the potential for water service disconnection for non-responsive accounts. Additionally, updates were provided on operator certification and plans for future meter replacements.
The discussion centered on the ongoing consolidation of school districts in Vermont, specifically focusing on the implications for Arlington's schools and the local town plan. Participants reviewed the legislative landscape, including current House and Senate plans for regional consolidation and the potential formation of cooperative education service agencies. The group addressed concerns regarding the future of the local high school, the impact of minimum class size targets, and the necessity of community engagement in planning for the town's educational future.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Arlington's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Arlington Water Department Systems Operator
Finance Administrator/Treasurer
Premium
Access the largest public sector contact database
© 2026 Starbridge