Emergency Generator Replacement RFP
Posted
Sep 14, 2026
Oct 6, 2026
Work consist of removal and disposal of existing generator, and existing two (2) transfer switches, electrical reading tests, pre-reads, and final test, receive, and install two (2) new transfer switches, receive, and install one (1) new dock station switch, sawcut, demo existing concrete pad, and provide new concrete pad to accommodate new generator, and paint existing bollards and existing wrought iron fence.
