Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sanger Unified School District
Remove all existing roof layers and all associated materials down to structural deck and dispose of offsite. Remove existing coping and dispose of offsite. Remove existing wall and curb flashings and dispose of offsite. Remove existing roof hatch and smoke hatches and dispose of offsite. Remove existing seismic support flashing enclosures and dispose of offsite. Remove abandoned equipment as indicated, demo mounting curbs and infill flush with structural deck. Remove existing through wall scuppers and dispose of offsite. Remove existing pitch pan and pourable sealant and dispose of offsite. Install new framing and plywood sheathing to match existing thickness at areas where abandon equipment was removed. Install new 1.5" base layer of rigid polyiso insulation throughout. 11. Install new tapered rigid poly iso insulation as indicated. Minimum 1/2:1212. Install new factory primed 1/4” manufacturer approved gypsum coverboard over all insulation and fasten to meet manufacturer requirements for specified warranty and wind uplift rating.
Posted Date
May 29, 2026
Due Date
Jun 16, 2026
Release: May 29, 2026
Sanger Unified School District
Close: Jun 16, 2026
Remove all existing roof layers and all associated materials down to structural deck and dispose of offsite. Remove existing coping and dispose of offsite. Remove existing wall and curb flashings and dispose of offsite. Remove existing roof hatch and smoke hatches and dispose of offsite. Remove existing seismic support flashing enclosures and dispose of offsite. Remove abandoned equipment as indicated, demo mounting curbs and infill flush with structural deck. Remove existing through wall scuppers and dispose of offsite. Remove existing pitch pan and pourable sealant and dispose of offsite. Install new framing and plywood sheathing to match existing thickness at areas where abandon equipment was removed. Install new 1.5" base layer of rigid polyiso insulation throughout. 11. Install new tapered rigid poly iso insulation as indicated. Minimum 1/2:1212. Install new factory primed 1/4” manufacturer approved gypsum coverboard over all insulation and fasten to meet manufacturer requirements for specified warranty and wind uplift rating.
Sanger Unified School District
High school exterior paint and site improvements.
Posted Date
May 15, 2026
Due Date
Jun 3, 2026
Release: May 15, 2026
Sanger Unified School District
Close: Jun 3, 2026
High school exterior paint and site improvements.
Sanger Unified School District
High school track resurfacing.
Posted Date
May 15, 2026
Due Date
Jun 15, 2026
Release: May 15, 2026
Sanger Unified School District
Close: Jun 15, 2026
High school track resurfacing.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If it’s a major construction project, the district may pursue sole source; otherwise do not pursue sole source.
Coops: Fleet/Facilities needs: Use OMNIA Partners cooperative if your solution is available.
Sanger Unified School District, CA reserves sole source for major construction projects.
Track vendor wins and renewal opportunities
Sanger Unified School District
This document is a Products and Services Quote/Order from AVID Center for the Sanger Unified School District, effective from July 1, 2025, to June 30, 2026, with a total amount of $86,197.00 plus applicable taxes. It details various AVID products and services, including membership fees, digital libraries, and professional development, itemized per school within the district. The agreement outlines invoicing terms and refers to external General Terms and Conditions and policies.
Effective Date
Jul 1, 2025
Expires
Effective: Jul 1, 2025
Sanger Unified School District
Expires:
This document is a Products and Services Quote/Order from AVID Center for the Sanger Unified School District, effective from July 1, 2025, to June 30, 2026, with a total amount of $86,197.00 plus applicable taxes. It details various AVID products and services, including membership fees, digital libraries, and professional development, itemized per school within the district. The agreement outlines invoicing terms and refers to external General Terms and Conditions and policies.
Sanger Unified School District
This document is a price quote (Q-507999-2) from Amplify Education, Inc. to Sanger Unified School District, issued on March 26, 2025, and expiring on July 31, 2025. It details the procurement of mCLASS DIBELS and Lectura products, kits, professional development, and shipping services. Licenses are active from July 1, 2025, until June 30, 2027. The subtotal for all items is $184,771.36, with an estimated sales tax of $1,640.30 and a total discount of $24,500.00. Payment terms are net 30 days, and the document includes comprehensive terms and conditions.
Effective Date
Jul 1, 2025
Expires
Effective: Jul 1, 2025
Sanger Unified School District
Expires:
This document is a price quote (Q-507999-2) from Amplify Education, Inc. to Sanger Unified School District, issued on March 26, 2025, and expiring on July 31, 2025. It details the procurement of mCLASS DIBELS and Lectura products, kits, professional development, and shipping services. Licenses are active from July 1, 2025, until June 30, 2027. The subtotal for all items is $184,771.36, with an estimated sales tax of $1,640.30 and a total discount of $24,500.00. Payment terms are net 30 days, and the document includes comprehensive terms and conditions.
AvailableSanger Unified School District
This contract between Imagine Learning and Sanger Unified School District outlines the provision of Edgenuity and Imagine EdgeEX learning services from October 1, 2025, to September 30, 2027. The agreement includes various services such as academic integrity integration and comprehensive concurrent user licenses for multiple sites, totaling $219,000.00. The contract specifies a payment term of Net 30 and notes that additional usage beyond purchased enrollments will be invoiced.
Effective Date
Oct 1, 2025
Expires
Effective: Oct 1, 2025
Sanger Unified School District
Expires:
This contract between Imagine Learning and Sanger Unified School District outlines the provision of Edgenuity and Imagine EdgeEX learning services from October 1, 2025, to September 30, 2027. The agreement includes various services such as academic integrity integration and comprehensive concurrent user licenses for multiple sites, totaling $219,000.00. The contract specifies a payment term of Net 30 and notes that additional usage beyond purchased enrollments will be invoiced.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Sanger Unified School District
The Board conducted a meeting featuring various recognitions, including local tribal representatives, school end-of-year awardees, and leadership team members. Key actions involved the authorization of multiple General Obligation Bond issuances and refunding, as well as the adoption of debt service estimates for the county. The Board also held a public hearing regarding developer fees and reviewed the adoption of a developer fee justification study. Additionally, the Board engaged in closed session discussions concerning personnel matters and litigation, and acted upon a comprehensive consent agenda covering agreements, student trips, and policy revisions, alongside receiving an update on the LCAP process.
This Local Control and Accountability Plan (LCAP) for Sanger Unified School District - Sanger Academy Charter School outlines a strategic direction for the 2026-27 school year. The plan focuses on three core goals: ensuring all students achieve at least one year of academic growth through a high-quality educational system; providing rigorous instruction and a Multi-Tiered System of Support to narrow achievement gaps for all student groups; and maintaining a safe and supportive school environment through enhanced transportation and appropriate class sizes. Key initiatives include targeted academic interventions, professional development for staff, social-emotional and multilingual support, and active parent engagement to foster an inclusive and high-achieving learning environment for all students.
This document is a mid-year update for the Local Control and Accountability Plan (LCAP) and Budget Overview for Parents. It outlines strategic goals focused on providing a high-quality educational system, ensuring student growth, and maintaining a safe school environment. Key priorities include fostering high academic rigor, implementing multi-tiered systems to narrow achievement gaps, increasing college/career indicators, and decreasing student suspension rates. The plan aims to provide necessary services to students with a commitment to continuous growth.
The Governing Board adopted a resolution to formally declare the election results for Governing Board seats. The resolution confirms the election of specific candidates to their respective trustee areas based on the highest number of votes received. Additionally, the Board directed the Clerk to notify the county elections official to facilitate the issuance of certificates of election to the newly elected members.
This Local Control and Accountability Plan for Sanger Unified School District outlines a comprehensive strategy to enhance educational outcomes for all students, with a primary focus on narrowing achievement gaps for English Learners, Low-Income, and Foster Youth students. The plan is built upon three core goals: raising the academic achievement of all students through professional learning, effective instruction, balanced literacy, and college/career readiness initiatives; closing achievement gaps via academic intervention, social-emotional/behavioral support, and multilingual learner programs within a multi-tiered system; and ensuring a safe school environment by improving transportation services and maintaining manageable class sizes. Additionally, the plan includes specific equity multiplier focus goals for Kings River High School and Community Day School to increase college/career readiness and decrease suspension rates for identified student groups by 2027.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Sanger Unified School District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge