2026 LMIG Milling and Resurfacing Various Streets (Request for Proposal)
Aug 14, 2026
Closes
Sep 24, 2026
Project consists of resurfacing work shall include the milling of the present asphalt to a depth of 1.5", the resurfacing of the milled pavement with a 1.5 thick layer of asphalt, and the striping of the new surface to match what was there before work began. Note that the milling depth at the gutter lines shall be such that the new surface is at the same elevation as the nose of the gutter.
