Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Red Lake Band of Chippewa Indians
Support a comprehensive evaluation for the community wastewater lagoon system. In the end, this evaluation will generate a Preliminary Engineering Report.
Posted Date
Apr 1, 2026
Due Date
Apr 23, 2026
Release: Apr 1, 2026
Red Lake Band of Chippewa Indians
Close: Apr 23, 2026
Support a comprehensive evaluation for the community wastewater lagoon system. In the end, this evaluation will generate a Preliminary Engineering Report.
AvailableRed Lake Band of Chippewa Indians
Improvements to the Lift Stations include renewing the interior surface of the wet wells and valve vaults; replacement of pumps, floats, guide rail systems, piping, valves, and fittings in the dry wells; installation of new concrete lids with aluminum access doors and safety grates to provide fall protection for the wet wells and dry wells; installation of electrical control panels with control improvements that detect incoming service abnormalities including phase-loss, unbalance, phase reversal under voltage, and over voltage; and control system improvements to provide rapid cycling protection, automatic cutout of pumps, provide local and direct phone alarms to operators, and generator receptacles for a portable generator.
Posted Date
Feb 25, 2026
Due Date
Mar 19, 2026
Release: Feb 25, 2026
Red Lake Band of Chippewa Indians
Close: Mar 19, 2026
Improvements to the Lift Stations include renewing the interior surface of the wet wells and valve vaults; replacement of pumps, floats, guide rail systems, piping, valves, and fittings in the dry wells; installation of new concrete lids with aluminum access doors and safety grates to provide fall protection for the wet wells and dry wells; installation of electrical control panels with control improvements that detect incoming service abnormalities including phase-loss, unbalance, phase reversal under voltage, and over voltage; and control system improvements to provide rapid cycling protection, automatic cutout of pumps, provide local and direct phone alarms to operators, and generator receptacles for a portable generator.
Red Lake Band of Chippewa Indians
The Red Lake Water and Sewer Department, in collaboration with the Indian Health Service is requesting qualification proposals for technical specifications, technical drawings, and inspection services for the 100,000-gallon single pedestal tank in Little Rock, MN.
Posted Date
Feb 12, 2026
Due Date
Mar 6, 2026
Release: Feb 12, 2026
Red Lake Band of Chippewa Indians
Close: Mar 6, 2026
The Red Lake Water and Sewer Department, in collaboration with the Indian Health Service is requesting qualification proposals for technical specifications, technical drawings, and inspection services for the 100,000-gallon single pedestal tank in Little Rock, MN.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Red Lake Band of Chippewa Indians's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database