Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Red Lake Band of Chippewa Indians
The Red Lake Water and Sewer Department, in collaboration with the Indian Health Service is requesting qualification proposals for technical specifications, technical drawings, and inspection services for the 100,000-gallon single pedestal tank in Little Rock, MN.
Posted Date
Feb 12, 2026
Due Date
Mar 6, 2026
Release: Feb 12, 2026
Red Lake Band of Chippewa Indians
Close: Mar 6, 2026
The Red Lake Water and Sewer Department, in collaboration with the Indian Health Service is requesting qualification proposals for technical specifications, technical drawings, and inspection services for the 100,000-gallon single pedestal tank in Little Rock, MN.
AvailableRed Lake Band of Chippewa Indians
Work consist of construction of a new single story 6,600 SF water treatment facility, including office and laboratory testing area. Structure consists of precast concrete T roof supported by insulated precast wall panels on cast-in-place concrete foundation. Interior partitions of CMU and GWB on metal studs. Roofing is EPDM on continuous insulation. Electrical, plumbing and HVAC systems are included. See outside link.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Red Lake Band of Chippewa Indians
Close: Dec 18, 2025
Work consist of construction of a new single story 6,600 SF water treatment facility, including office and laboratory testing area. Structure consists of precast concrete T roof supported by insulated precast wall panels on cast-in-place concrete foundation. Interior partitions of CMU and GWB on metal studs. Roofing is EPDM on continuous insulation. Electrical, plumbing and HVAC systems are included. See outside link.
Red Lake Band of Chippewa Indians
Improvements and repairs for an existing 100,000-gallon water storage tank for the Ponemah Community. Interior and exterior structural improvements will be required followed by interior and exterior blasting to prepare for coating installation. The improvements and repairs are to bring the tank into compliance with OSHA Regulations and AWWA Standards. The work is expected to start in May 2026, weather permitting.
Posted Date
Aug 21, 2025
Due Date
Sep 24, 2025
Release: Aug 21, 2025
Red Lake Band of Chippewa Indians
Close: Sep 24, 2025
Improvements and repairs for an existing 100,000-gallon water storage tank for the Ponemah Community. Interior and exterior structural improvements will be required followed by interior and exterior blasting to prepare for coating installation. The improvements and repairs are to bring the tank into compliance with OSHA Regulations and AWWA Standards. The work is expected to start in May 2026, weather permitting.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Red Lake Band of Chippewa Indians's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Red Lake Band of Chippewa Indians's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database