Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Fond du Lac Band
Project consists of sitework, excavation and grading, utilities, ICF foundations, drainage system, paving, landscaping, Premanufactured structure, thin brick, manufactured masonry, EPDM roofing, metal fencing and gates, and low voltage equipment. Fond du Lac’s Tribal Employment Rights Ordinance and Davis-Bacon Prevailing Wages shall be enforced for this project.
Posted Date
-
Due Date
Jul 9, 2026
Release: -
Fond du Lac Band
Close: Jul 9, 2026
Project consists of sitework, excavation and grading, utilities, ICF foundations, drainage system, paving, landscaping, Premanufactured structure, thin brick, manufactured masonry, EPDM roofing, metal fencing and gates, and low voltage equipment. Fond du Lac’s Tribal Employment Rights Ordinance and Davis-Bacon Prevailing Wages shall be enforced for this project.
AvailableFond du Lac Band
Constructing a new trail. This will include ADA curb ramps, regrading and ditch grading, storm sewer, RRFB, and other miscellaneous installations.
Posted Date
May 22, 2026
Due Date
Jun 25, 2026
Release: May 22, 2026
Fond du Lac Band
Close: Jun 25, 2026
Constructing a new trail. This will include ADA curb ramps, regrading and ditch grading, storm sewer, RRFB, and other miscellaneous installations.
Fond du Lac Band
The Fond du Lac Band of Lake Superior Chippewa Construction Projects Division is soliciting proposals from qualified general contractors to perform HVAC upgrades at the Tribal Center in Cloquet, MN. The solicitation includes specifications, drawings, and two addenda listed on the buyer's detail page. Bids open March 13, 2026 at 3:00 PM local time and are due April 16, 2026 at 2:00 PM local time.
Posted Date
Mar 13, 2026
Due Date
Apr 16, 2026
Release: Mar 13, 2026
Fond du Lac Band
Close: Apr 16, 2026
The Fond du Lac Band of Lake Superior Chippewa Construction Projects Division is soliciting proposals from qualified general contractors to perform HVAC upgrades at the Tribal Center in Cloquet, MN. The solicitation includes specifications, drawings, and two addenda listed on the buyer's detail page. Bids open March 13, 2026 at 3:00 PM local time and are due April 16, 2026 at 2:00 PM local time.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge