Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Leech Lake Band's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Leech Lake Band
Construction of approx., 1,189 LF of gravity sanitary sewer, sanitary sewer services, sewer lift station, and onsite treatment system. Work includes Construction Surveying 1 LS; Mobilization 1 LS; Clearing and Grubbing 1 LS; Abandon Septic tank 14 EA; Dewatering 1 LS; Dozer 100 hour; Aggregate Base, Class 5 605 ton; 4" Clean out assembly 14 EA; 6"x4" PVC Wye 1 EA; 8"x4" PVC Wye 12 EA; 8"x6" PVC Wye 1 EA; Sanitary Sewer Lift Station 1 LS; Televise Sanitary Sewer 1187 LF; 8" P.V.C. Sanitary Sewer (SDR 35) 1150 LF; 6" PVC Sanitary Sewer (SDR 35) 37 LF; 2" PVC Sanitary Forcemain 30 LF; 4" PVC Sanitary Sewer - SDR 26 445 LF; Septic Treatment System 1 LS; 4" Polystyrene Insulation 195 SY; Construct Sanitary Structure 46 LF; Casting Assembly 5 EA. See attached file.
Posted Date
Jul 24, 2025
Due Date
Aug 19, 2025
Release: Jul 24, 2025
Leech Lake Band
Close: Aug 19, 2025
Construction of approx., 1,189 LF of gravity sanitary sewer, sanitary sewer services, sewer lift station, and onsite treatment system. Work includes Construction Surveying 1 LS; Mobilization 1 LS; Clearing and Grubbing 1 LS; Abandon Septic tank 14 EA; Dewatering 1 LS; Dozer 100 hour; Aggregate Base, Class 5 605 ton; 4" Clean out assembly 14 EA; 6"x4" PVC Wye 1 EA; 8"x4" PVC Wye 12 EA; 8"x6" PVC Wye 1 EA; Sanitary Sewer Lift Station 1 LS; Televise Sanitary Sewer 1187 LF; 8" P.V.C. Sanitary Sewer (SDR 35) 1150 LF; 6" PVC Sanitary Sewer (SDR 35) 37 LF; 2" PVC Sanitary Forcemain 30 LF; 4" PVC Sanitary Sewer - SDR 26 445 LF; Septic Treatment System 1 LS; 4" Polystyrene Insulation 195 SY; Construct Sanitary Structure 46 LF; Casting Assembly 5 EA. See attached file.
Leech Lake Band
The construction of 0.75 miles of road. Work includes but is not limited to, bituminous pavement and pavement striping.
Posted Date
Jul 13, 2025
Due Date
Jul 30, 2025
Release: Jul 13, 2025
Leech Lake Band
Close: Jul 30, 2025
The construction of 0.75 miles of road. Work includes but is not limited to, bituminous pavement and pavement striping.
Leech Lake Band
Provide DESIGN BUILD services for the remodel and expansion of Leech Lake Food Distribution Center.
Posted Date
Aug 8, 2024
Due Date
Aug 16, 2024
Release: Aug 8, 2024
Leech Lake Band
Close: Aug 16, 2024
Provide DESIGN BUILD services for the remodel and expansion of Leech Lake Food Distribution Center.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.