2026 Stormwater Infiltration Basin-Red Lake, MN
Posted
Sep 28, 2026
Oct 6, 2026
The project involves the construction of a stormwater infiltration basin, which includes pavement and curb removal, bituminous and curb replacement, 2,726 cubic yards of excavation, 72 LF of 15–18" storm sewer, 27 LF of drainage structures, castings, 72 square yards of aggregate base, as well as associated erosion control and turf establishment.