Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Provo-Utah Lake International Airport
Work includes 1 LS of mobilization; 15,674 LF of install #8 awg l-824c, 5000v, wire; 18,747 LF of install #6 awg bare copper counterpoise, including ground rods and terminations; 27,064 LF of install #8 awg thwn-2, 600v, wire; 6,766 LF of install #6 awg l-824c, ground wire; 18,396 LF of install 1-2" sch. 40 pvc conduit, direct earth buried; 351 LF of install 1-2" sch. 40 pvc conduit, concrete encased; 2 EA of install new l-827b junction box; 148 EA of remove existing runway edge light, complete; 32 EA of remove existing runway threshold light, complete; 1 EA of remove existing papi system from existing concrete foundations, complete; etc, see attached file.
Posted Date
Jun 4, 2026
Due Date
Jun 30, 2026
Release: Jun 4, 2026
Provo-Utah Lake International Airport
Close: Jun 30, 2026
Work includes 1 LS of mobilization; 15,674 LF of install #8 awg l-824c, 5000v, wire; 18,747 LF of install #6 awg bare copper counterpoise, including ground rods and terminations; 27,064 LF of install #8 awg thwn-2, 600v, wire; 6,766 LF of install #6 awg l-824c, ground wire; 18,396 LF of install 1-2" sch. 40 pvc conduit, direct earth buried; 351 LF of install 1-2" sch. 40 pvc conduit, concrete encased; 2 EA of install new l-827b junction box; 148 EA of remove existing runway edge light, complete; 32 EA of remove existing runway threshold light, complete; 1 EA of remove existing papi system from existing concrete foundations, complete; etc, see attached file.
AvailableProvo-Utah Lake International Airport
Construction of utilities, roadways, parking lots, and airport taxilane facilities to accommodate new airport hangar development.
Posted Date
Mar 18, 2026
Due Date
Apr 8, 2026
Release: Mar 18, 2026
Provo-Utah Lake International Airport
Close: Apr 8, 2026
Construction of utilities, roadways, parking lots, and airport taxilane facilities to accommodate new airport hangar development.
Provo-Utah Lake International Airport
Seeking professional services to develop a comprehensive Vegetation Management Plan for Utah Lake, focusing on invasive-species control, native habitat restoration, and adaptive monitoring.
Posted Date
Jan 20, 2026
Due Date
Feb 6, 2026
Release: Jan 20, 2026
Provo-Utah Lake International Airport
Close: Feb 6, 2026
Seeking professional services to develop a comprehensive Vegetation Management Plan for Utah Lake, focusing on invasive-species control, native habitat restoration, and adaptive monitoring.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Provo-Utah Lake International Airport
This Airport Master Plan for Provo Municipal Airport evaluates the capacity of existing facilities to accommodate current and forecasted activity levels, identifying necessary improvements to support the airport's strategic vision. It details requirements for airfield infrastructure, including runways and taxiways, and addresses emerging trends such as electric propulsion and eVTOL operations. The plan also assesses terminal area facilities like passenger terminals, aprons, and landside components, alongside levee infrastructure, to ensure safe, efficient, and compliant operations over the planning period.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Provo-Utah Lake International Airport's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge