New Cold Storage Building At the Parkersburg City Park RFP
Posted
Nov 17, 2026
Dec 8, 2026
The project will include demolition and removal of the existing storage structure and all work required to prepare the site for the proposed cold storage building including disconnecting existing utilities. New construction work will consist of installation of all components required for the proposed cold storage building construction as proposed by the building manufacturer including the foundation system, new slab on grade, and assembly and installation of all components including reconnecting utilities and site work.


