Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Norton Housing Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Norton Housing Authority
Removal of existing tiled bathtub surround including substrates and insulation to bare wood stud framing. Removal of existing shower/ tub valve, divertor, shower head and tub spout. Modification to existing plumbing to install new shower head system, tub spout and mixing valve with integral divertor. Install new insulation, vapor barrier, cement board, and maintenance free one-piece wall-surround assembly including integral double corner- shelf. Existing bathtub to remain.
Posted Date
Dec 17, 2025
Due Date
Feb 12, 2026
Release: Dec 17, 2025
Norton Housing Authority
Close: Feb 12, 2026
Removal of existing tiled bathtub surround including substrates and insulation to bare wood stud framing. Removal of existing shower/ tub valve, divertor, shower head and tub spout. Modification to existing plumbing to install new shower head system, tub spout and mixing valve with integral divertor. Install new insulation, vapor barrier, cement board, and maintenance free one-piece wall-surround assembly including integral double corner- shelf. Existing bathtub to remain.
AvailableNorton Housing Authority
Work include pumping and cleaning existing septic tanks, removal and replacement of existing septic system components including manholes, piping, pump chamber and valve assembly, as well as new electrical conduit work, generator installation, and all other incidental work.
Posted Date
Jan 7, 2025
Due Date
Jan 24, 2025
Release: Jan 7, 2025
Norton Housing Authority
Close: Jan 24, 2025
Work include pumping and cleaning existing septic tanks, removal and replacement of existing septic system components including manholes, piping, pump chamber and valve assembly, as well as new electrical conduit work, generator installation, and all other incidental work.
Norton Housing Authority
Work include bathroom vanity replacement.
Posted Date
Sep 5, 2024
Due Date
Sep 26, 2024
Release: Sep 5, 2024
Norton Housing Authority
Close: Sep 26, 2024
Work include bathroom vanity replacement.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.