A1.00 are included within this item. This item generally consists of, but is not limited to, removal of existing brick veneer; removal of existing concrete block brick ledge down to existing foundations; removal of existing rim joist and sill plate; removal of existing downspout; removal of existing handrail and brackets; removal of existing 2x lumber and anchors; removal of existing concrete; removal of existing steel angle and anchors; removal of existing door trim; removal of existing concrete block and foundations below grade; and removal of all debris remaining from previous ramp demolition. 2. New Work: Construction of new cement board siding; new 1x PVC trim to match existing; new and/or salvaged brick veneer stacked to return back to existing wall at limits of cement board siding; new aluminum downspouts including connections to existing stormwater management system; cleaning, preparing, repairing/patching and painting existing CMU foundation wall block; tooth-in edge of CMU demolition with new CMU; replacement of sill plate and rim joists; and installation of compacted porous fill such as AASHTO No. 57 aggregate to grade within the limits of the existing ramp. Contractor shall provide proper shoring and protection of existing building materials to remain to prevent damage to existing materials. Complete improvements in proper sequencing as required to protect existing building materials to remain. No additional payment will be made for removal and replacement of materials beyond the limits shown on the Contract Drawings.