Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Adams Fire District
The project consists of furnishing all tools, labor, materials and equipment and testing necessary for the installation of temporary shoring to support the floor of the Adams Fire District fire engine garage.
Posted Date
Mar 28, 2025
Due Date
Apr 11, 2025
Release: Mar 28, 2025
Adams Fire District
Close: Apr 11, 2025
The project consists of furnishing all tools, labor, materials and equipment and testing necessary for the installation of temporary shoring to support the floor of the Adams Fire District fire engine garage.
Adams Fire District
Work includes roof recover.
Posted Date
Dec 30, 2024
Due Date
Feb 4, 2025
Release: Dec 30, 2024
Adams Fire District
Close: Feb 4, 2025
Work includes roof recover.
Adams Fire District
Removal of all existing roof membrane and insulation down to the original roof (tar and gravel). Installation of continuous above-deck mechanically attached insulation to match the R-value of the existing above-deck continuous insulation. Installation of second roof system, fully adhered EPDM membrane roofing with all new flashings, over the original remaining tar and gravel roof.
Posted Date
Jan 2, 2025
Due Date
Feb 4, 2025
Release: Jan 2, 2025
Adams Fire District
Close: Feb 4, 2025
Removal of all existing roof membrane and insulation down to the original roof (tar and gravel). Installation of continuous above-deck mechanically attached insulation to match the R-value of the existing above-deck continuous insulation. Installation of second roof system, fully adhered EPDM membrane roofing with all new flashings, over the original remaining tar and gravel roof.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Adams Fire District
The committee convened to discuss and finalize various components of the FY27 budget. Key agenda items included adjusting the indirect cost split between the General and Enterprise funds, implementing a 3% Cost of Living Allowance, and reviewing salary recommendations for administrative positions and the Fire Department. The committee reviewed and recommended budget appropriations for numerous categories, including legal services, audit fees, office expenses, building maintenance, communications, insurance, and retirement system contributions. Additionally, they evaluated specific operational needs for the Fire Department, including gear updates and the potential creation of a separate warrant article for a full-time firefighter position.
The committee addressed the transition from an elected to an appointed Clerk and Treasurer and approved a motion prohibiting mail-in voting for the annual election. Future meeting dates for the budget and committee sessions were established. The Superintendent's report covered significant water main and service repairs, updates on bridge replacement design and construction projects, the acquisition of a new utility truck, and the status of emergency response planning and master meter upgrades. The Bookkeeper's report detailed delinquent account activity, the district's website platform conversion, the implementation of employee direct deposit, and the status of payments for the Cheshire Pilot Program.
The committee convened to review and recommend various appropriations for the FY27 budget, focusing on both the Enterprise and General Funds. Key discussion topics included salary allocations for the Water Department, investments in infrastructure such as SCADA system maintenance and electronic meter replacements, and software implementation for asset management. The committee also evaluated General Fund expenditures, including reserve funds, support fees, safety equipment grants, and the purchase of a shoring support system. Further items addressed involved a space needs assessment for district facilities, tank modifications at Glen Street and Orchard Terrace, dam inspection requirements, the potential hiring of a full-time firefighter, and adjustments to committee salary structures and firefighter compensation.
The committee reviewed and approved the job description for the Assistant Clerk & Treasurer position, deciding to post the opening both internally and externally. Additionally, the committee approved the hiring of a candidate for the Laborer/Operator position, noting that training would begin immediately upon employment pending the successful completion of pre-employment testing.
The Adams Fire District's annual report includes a dedication to Richard W. Tarsa, Jr., for his 12 years of service on the Prudential Committee. The report covers various topics such as the Prudential Committee's efforts to provide the best possible service to rate payers by upgrading the distribution system, monitoring its condition, and planning future projects. It also includes the Chief Engineer's report on the department's responses to 294 calls for assistance, including structure fires and motor vehicle accidents. Additionally, the report details the Superintendent's overview of water pumping, water main breaks, and water system repairs, as well as updates on water quality testing and recommendations for future improvements.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Adams Fire District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge