Athletic Field Stormwater Conveyance Reconfiguration Project – Phase 2
Posted
-
Oct 1, 2026
The new stormwater system project reconfigures stormwater runoff conveyance near the athletic fields at High School. The project includes installing a new stormwater manhole, associated stormwater conveyance piping, cutting and grouting existing stormwater conveyance piping, trench excavation and trench preparation for new stormwater conveyance piping, a rip rap apron, construction erosion and sediment control, grading, and site restoration through landscaping and seeding.